Skip to content
🚿

Bathroom concealed work

Stage-specific US bathroom remodel checks for rough-in layout, plumbing, ventilation, waterproofing, electric floor heat, curbless transitions, and shower-glass backing before finishes hide the work.

Bathroom layout and fixture clearances before rough-in checklist

A pre-rough-in bathroom layout checklist for fixture centerlines, door and drawer conflicts, shower entry, toilet and vanity use space, accessibility goals, wall thickness, finish buildup, and service access before plumbing and electrical locations become expensive to move.

Open checklist

Bathroom plumbing rough-in before wall close-up checklist

A pre-cover bathroom plumbing checklist for fixture locations, drain and vent routing, pipe support, protection plates, insulation, shutoffs, pressure or leak testing, fireblocking, and inspection evidence before walls, floors, and ceilings are closed.

Open checklist

Shower valve and penetration waterproofing before tile checklist

A focused pre-tile checklist for shower valve openings, pipe penetrations, body sprays, handheld outlets, escutcheon seal zones, compatible collars, membrane continuity, fastener holes, and documentation before tile conceals the waterproofing.

Open checklist

Shower niche and bench waterproofing before tile checklist

A pre-tile shower niche and bench checklist for framing stability, sloped horizontal surfaces, membrane continuity, corners, seams, penetrations, prefabricated components, transitions to wall waterproofing, cure, and photographic evidence.

Open checklist

Bathroom exhaust duct before ceiling close-up checklist

A pre-cover bathroom ventilation checklist for fan selection, outdoor termination, duct size and material, route, support, insulation, air sealing, backdraft control, electrical coordination, measured airflow planning, and documentation before ceilings and attic access hide the installation.

Open checklist

Electric bathroom floor heating before tile checklist

A pre-tile electric floor-heating checklist for approved product and layout, dedicated controls and protection, cable spacing, sensor placement, resistance and insulation-resistance records, embedding, movement joints, damage prevention, and owner documentation.

Open checklist

Shower glass backing and anchorage before tile checklist

A pre-tile shower-glass checklist for approved enclosure type, door swing, panel dimensions, wall and curb backing, waterproofing-safe attachment zones, concealed utilities, edge distances, blocking records, and installer coordination before tile removes access.

Open checklist

Curbless shower slope and transition before tile checklist

A pre-tile curbless-shower checklist for structural recess or buildup, drain elevation, continuous slope, entry and bathroom transitions, waterproofing extent, glass and splash control, heating integration, accessibility goals, flood-test evidence, and finish-height coordination.

Open checklist