Valve and trim openings are correctly sized and located
Critical itemOpenings should permit service and trim installation without exceeding the waterproofing detail limits.
A focused pre-tile checklist for shower valve openings, pipe penetrations, body sprays, handheld outlets, escutcheon seal zones, compatible collars, membrane continuity, fastener holes, and documentation before tile conceals the waterproofing.
6 items to check
Openings should permit service and trim installation without exceeding the waterproofing detail limits.
The selected membrane system should remain continuous and compatible at every penetration.
Patches and overlaps should follow system dimensions and cure requirements without pinholes or fishmouths.
The completed assembly should direct incidental water outward while preserving service access.
Mortar should not cover uncured, contaminated, damaged, or unapproved repair areas.
Evidence should identify product, location, date, and completed detail.
Use after the waterproofing membrane is complete around shower controls and outlets but before tile. This is not a flood test of the receptor and does not approve plumbing function. Inspect from the room, accessible framing, and dated stage photographs. Do not energize exposed electrical work, pressure-test systems without authorization, or walk on uncured waterproofing, mortar, or heating assemblies.
A pre-cover bathroom plumbing checklist for fixture locations, drain and vent routing, pipe support, protection plates, insulation, shutoffs, pressure or leak testing, fireblocking, and inspection evidence before walls, floors, and ceilings are closed.
A pre-tile shower niche and bench checklist for framing stability, sloped horizontal surfaces, membrane continuity, corners, seams, penetrations, prefabricated components, transitions to wall waterproofing, cure, and photographic evidence.
A pre-rough-in bathroom layout checklist for fixture centerlines, door and drawer conflicts, shower entry, toilet and vanity use space, accessibility goals, wall thickness, finish buildup, and service access before plumbing and electrical locations become expensive to move.
A pre-cover bathroom ventilation checklist for fan selection, outdoor termination, duct size and material, route, support, insulation, air sealing, backdraft control, electrical coordination, measured airflow planning, and documentation before ceilings and attic access hide the installation.