Structural recess, buildup, and drain elevation achieve the planned finish heights
Critical itemThe assembly should provide required support and drainage without unapproved structural modification.
A pre-tile curbless-shower checklist for structural recess or buildup, drain elevation, continuous slope, entry and bathroom transitions, waterproofing extent, glass and splash control, heating integration, accessibility goals, flood-test evidence, and finish-height coordination.
6 items to check
The assembly should provide required support and drainage without unapproved structural modification.
Slope should be continuous and compatible with tile size and drain geometry without backfall.
The approved system should remain continuous beyond the nominal shower footprint where required by design and exposure.
The layout should limit water escape while preserving intended access and operation.
Testing should occur before tile and defects should be repaired and retested.
The owner should retain enough evidence to distinguish design from later tile workmanship.
Use after the receptor substrate and waterproofing are complete but before tile. A curbless appearance does not eliminate drainage, waterproofing, structural, or accessibility requirements. Inspect from the room, accessible framing, and dated stage photographs. Do not energize exposed electrical work, pressure-test systems without authorization, or walk on uncured waterproofing, mortar, or heating assemblies.
A pre-rough-in bathroom layout checklist for fixture centerlines, door and drawer conflicts, shower entry, toilet and vanity use space, accessibility goals, wall thickness, finish buildup, and service access before plumbing and electrical locations become expensive to move.
A US job-site check for verifying a shower receptor or pan liner flood test before tile, setting bed, curb finish, or other cover-up hides the waterproofing.
A pre-cover bathroom plumbing checklist for fixture locations, drain and vent routing, pipe support, protection plates, insulation, shutoffs, pressure or leak testing, fireblocking, and inspection evidence before walls, floors, and ceilings are closed.
A focused pre-tile checklist for shower valve openings, pipe penetrations, body sprays, handheld outlets, escutcheon seal zones, compatible collars, membrane continuity, fastener holes, and documentation before tile conceals the waterproofing.