Glass type, panel lines, door swing, hinges, clamps, and support locations are defined
Critical itemThe enclosure concept should be sufficiently developed to locate structural backing and avoid conflicts.
A pre-tile shower-glass checklist for approved enclosure type, door swing, panel dimensions, wall and curb backing, waterproofing-safe attachment zones, concealed utilities, edge distances, blocking records, and installer coordination before tile removes access.
6 items to check
The enclosure concept should be sufficiently developed to locate structural backing and avoid conflicts.
Blocking and framing should transfer enclosure loads without relying on tile, backer, or hollow anchors alone.
Attachment zones should avoid concealed services and unnecessary waterproofing penetrations.
The system should define sealant, hole preparation, fastener, and prohibited locations.
Substrates should be sufficiently plumb, straight, and stable for hardware adjustment and seals.
Final installation should use an accurate concealed-work record.
Use before backer and tile conceal framing at shower glass attachment locations. Final glass engineering and fasteners remain the glass installer’s responsibility. Inspect from the room, accessible framing, and dated stage photographs. Do not energize exposed electrical work, pressure-test systems without authorization, or walk on uncured waterproofing, mortar, or heating assemblies.
A pre-rough-in bathroom layout checklist for fixture centerlines, door and drawer conflicts, shower entry, toilet and vanity use space, accessibility goals, wall thickness, finish buildup, and service access before plumbing and electrical locations become expensive to move.
A pre-tile shower niche and bench checklist for framing stability, sloped horizontal surfaces, membrane continuity, corners, seams, penetrations, prefabricated components, transitions to wall waterproofing, cure, and photographic evidence.
A pre-cover bathroom plumbing checklist for fixture locations, drain and vent routing, pipe support, protection plates, insulation, shutoffs, pressure or leak testing, fireblocking, and inspection evidence before walls, floors, and ceilings are closed.
A focused pre-tile checklist for shower valve openings, pipe penetrations, body sprays, handheld outlets, escutcheon seal zones, compatible collars, membrane continuity, fastener holes, and documentation before tile conceals the waterproofing.