Niche and bench framing is rigid, supported, and coordinated with utilities
Critical itemThe substrate should resist movement and avoid conflicts with pipes, wiring, exterior-wall insulation, or structural members.
A pre-tile shower niche and bench checklist for framing stability, sloped horizontal surfaces, membrane continuity, corners, seams, penetrations, prefabricated components, transitions to wall waterproofing, cure, and photographic evidence.
6 items to check
The substrate should resist movement and avoid conflicts with pipes, wiring, exterior-wall insulation, or structural members.
Horizontal surfaces should drain according to the approved system rather than hold water against walls or glass.
Inside and outside corners should use approved pieces, folds, overlaps, or liquid-film thickness.
Penetrations should be avoided or detailed with approved sealing and backing.
Adhesives, sealants, membranes, backers, and cure sequence should be approved together.
Tile should not proceed until defects are repaired and evidence is saved.
Use after niches, benches, shelves, and ledges are fully waterproofed but before tile. The receptor flood test alone does not prove these elevated features are correct. Inspect from the room, accessible framing, and dated stage photographs. Do not energize exposed electrical work, pressure-test systems without authorization, or walk on uncured waterproofing, mortar, or heating assemblies.
A focused pre-tile checklist for shower valve openings, pipe penetrations, body sprays, handheld outlets, escutcheon seal zones, compatible collars, membrane continuity, fastener holes, and documentation before tile conceals the waterproofing.
A US job-site check for verifying a shower receptor or pan liner flood test before tile, setting bed, curb finish, or other cover-up hides the waterproofing.
A pre-rough-in bathroom layout checklist for fixture centerlines, door and drawer conflicts, shower entry, toilet and vanity use space, accessibility goals, wall thickness, finish buildup, and service access before plumbing and electrical locations become expensive to move.
A pre-cover bathroom plumbing checklist for fixture locations, drain and vent routing, pipe support, protection plates, insulation, shutoffs, pressure or leak testing, fireblocking, and inspection evidence before walls, floors, and ceilings are closed.