Bathroom plumbing rough-in before wall close-up checklist

A pre-cover bathroom plumbing checklist for fixture locations, drain and vent routing, pipe support, protection plates, insulation, shutoffs, pressure or leak testing, fireblocking, and inspection evidence before walls, floors, and ceilings are closed.

6 items to check

Inspection progress0 of 6
0%

Fixture, valve, drain, and vent locations match the approved finished layout

Critical item

Rough-ins should align with selected products and finished surfaces without field improvisation.

Drain and vent routing, slope, fittings, and cleanouts are complete

Critical item

Drainage and vent piping should follow the approved design and adopted plumbing requirements.

Pipes are supported and protected from fasteners, movement, freezing, and abrasion

Critical item

Supports, sleeves, nail plates, isolation, and insulation should suit the piping and framing conditions.

Shutoffs, mixing components, carriers, and concealed connections are secured

Critical item

Valves and supports should remain accessible where required and resist operation loads without stressing piping.

Required pressure, leak, drainage, and permit inspections are passed before cover

Critical item

The applicable test and official inspection should be complete before concealment.

Pre-cover photos and approved corrections document the entire rough-in

The owner should retain a location record for future drilling, service, and warranty claims.

Use after bathroom supply, drain, waste, vent, and fixture rough-ins are installed but before insulation, backer, drywall, or flooring conceals them. Licensed-trade and permit requirements vary. Inspect from the room, accessible framing, and dated stage photographs. Do not energize exposed electrical work, pressure-test systems without authorization, or walk on uncured waterproofing, mortar, or heating assemblies.

Reference standards

  • Approved bathroom plan, adopted state and local code, permit and inspection conditions, authority having jurisdiction requirements, signed scope, and exact plumbing, waterproofing, ventilation, heating, tile, glass, and accessory manufacturer instructions
  • Approved plumbing plan, fixture rough-in sheets, piping system instructions, test procedure, and inspection record
  • Tools

  • Approved plans, fixture and product submittals, permit records, and authorized change orders
  • Tape measure, level, flashlight, camera, and manufacturer-approved test records
  • Dated pre-cover photographs showing every wall, floor, penetration, backing location, and test result