Dimensions are taken to finished surfaces, not bare framing
Critical itemFixture and clearance dimensions should account for backer, membranes, tile, drywall, panels, trim, and cabinet fillers.
A pre-rough-in bathroom layout checklist for fixture centerlines, door and drawer conflicts, shower entry, toilet and vanity use space, accessibility goals, wall thickness, finish buildup, and service access before plumbing and electrical locations become expensive to move.
6 items to check
Fixture and clearance dimensions should account for backer, membranes, tile, drywall, panels, trim, and cabinet fillers.
Actual fixture models and approved plans should control rough-in centers and connection zones.
Normal operation should not create collisions, trapped users, blocked controls, or inaccessible storage.
Components requiring inspection or replacement should have access consistent with product and code requirements.
The assembly should accommodate required drainage and finish thickness without unintended steps or door conflicts.
Field changes should be dated and accepted by authorized parties before dependent work proceeds.
Use before plumbing, electrical, blocking, or framing changes are finalized. This page coordinates geometry and use; it does not approve structural alterations or substitute for permit review. Inspect from the room, accessible framing, and dated stage photographs. Do not energize exposed electrical work, pressure-test systems without authorization, or walk on uncured waterproofing, mortar, or heating assemblies.
A pre-cover bathroom plumbing checklist for fixture locations, drain and vent routing, pipe support, protection plates, insulation, shutoffs, pressure or leak testing, fireblocking, and inspection evidence before walls, floors, and ceilings are closed.
A pre-tile shower-glass checklist for approved enclosure type, door swing, panel dimensions, wall and curb backing, waterproofing-safe attachment zones, concealed utilities, edge distances, blocking records, and installer coordination before tile removes access.
A focused pre-tile checklist for shower valve openings, pipe penetrations, body sprays, handheld outlets, escutcheon seal zones, compatible collars, membrane continuity, fastener holes, and documentation before tile conceals the waterproofing.
A pre-tile shower niche and bench checklist for framing stability, sloped horizontal surfaces, membrane continuity, corners, seams, penetrations, prefabricated components, transitions to wall waterproofing, cure, and photographic evidence.