HVAC replacement bid and equipment comparison checklist

An apples-to-apples HVAC replacement proposal checklist for equipment capacity and efficiency, load-calculation basis, ducts, electrical work, refrigerant lines, condensate, controls, permits, removal, commissioning, warranties, rebates, schedule, and payment terms before contractor selection.

Open checklist

HVAC load calculation review before equipment order checklist

A homeowner review checklist for confirming that heating and cooling loads use the actual home, climate, envelope, infiltration, ventilation, duct location, room-by-room needs, design temperatures, internal gains, and equipment performance before HVAC or heat-pump equipment is ordered.

Open checklist

HVAC duct evaluation before equipment replacement checklist

A pre-installation duct checklist for accessible condition, leakage, sizing, static-pressure risk, return paths, room airflow, insulation, supports, contamination, filter arrangement, abandoned ducts, and repair scope before new HVAC equipment is connected to an unsuitable distribution system.

Open checklist

Heat-pump installation before startup checklist

A pre-startup heat-pump installation checklist for matched equipment, mounting and clearances, refrigerant line set, electrical service, condensate, ducts, filters, sensors, controls, auxiliary heat, weather protection, penetrations, and permit readiness before the system is energized and commissioned.

Open checklist

HVAC electrical, condensate, and controls before startup checklist

A focused pre-startup checklist for HVAC branch circuits, disconnects, grounding, control wiring, thermostat configuration, condensate routing and overflow devices, pumps, auxiliary heat, interlocks, sensors, labels, and inspection status before energization.

Open checklist

HVAC commissioning before final payment checklist

A final-payment commissioning checklist for proving HVAC or heat-pump airflow, external static pressure, refrigerant charge, temperature and humidity operation, condensate, controls, auxiliary heat, room delivery, noise, fault codes, documentation, and correction closure after installation.

Open checklist

HVAC rebate, warranty, and owner handover checklist

A closeout checklist for HVAC model and serial records, permits, commissioning report, warranty registration, labor warranty, rebate and tax documentation, owner account transfer, thermostat training, filter and maintenance schedule, emergency shutoffs, installer contacts, and final invoice.