The calculation models the actual conditioned home
Critical itemFloor area, volume, room use, orientation, additions, vaulted spaces, and conditioned boundaries should match reality.
A homeowner review checklist for confirming that heating and cooling loads use the actual home, climate, envelope, infiltration, ventilation, duct location, room-by-room needs, design temperatures, internal gains, and equipment performance before HVAC or heat-pump equipment is ordered.
6 items to check
Floor area, volume, room use, orientation, additions, vaulted spaces, and conditioned boundaries should match reality.
Envelope assumptions should reflect verified construction or documented conservative values.
The calculation should use accepted local design weather and stated indoor conditions.
Loads affected by attic or crawlspace ducts, outdoor-air ventilation, and moisture should not be ignored.
Whole-house capacity alone is insufficient to assess room delivery and return paths.
Capacity should be compared at relevant operating conditions and control stages.
Use after the contractor provides a load calculation and before final equipment selection. This checklist does not recalculate Manual J; it checks whether the inputs and output are credible and traceable. Do not open energized equipment, handle refrigerant, defeat safety controls, or enter unsafe attics or crawlspaces. Require licensed or qualified HVAC and electrical work where applicable.
An apples-to-apples HVAC replacement proposal checklist for equipment capacity and efficiency, load-calculation basis, ducts, electrical work, refrigerant lines, condensate, controls, permits, removal, commissioning, warranties, rebates, schedule, and payment terms before contractor selection.
A pre-installation duct checklist for accessible condition, leakage, sizing, static-pressure risk, return paths, room airflow, insulation, supports, contamination, filter arrangement, abandoned ducts, and repair scope before new HVAC equipment is connected to an unsuitable distribution system.
A pre-startup heat-pump installation checklist for matched equipment, mounting and clearances, refrigerant line set, electrical service, condensate, ducts, filters, sensors, controls, auxiliary heat, weather protection, penetrations, and permit readiness before the system is energized and commissioned.
A focused pre-startup checklist for HVAC branch circuits, disconnects, grounding, control wiring, thermostat configuration, condensate routing and overflow devices, pumps, auxiliary heat, interlocks, sensors, labels, and inspection status before energization.