Accessible ducts, plenums, boots, joints, supports, and insulation are surveyed
Critical itemThe retained system should be physically sound and serviceable.
A pre-installation duct checklist for accessible condition, leakage, sizing, static-pressure risk, return paths, room airflow, insulation, supports, contamination, filter arrangement, abandoned ducts, and repair scope before new HVAC equipment is connected to an unsuitable distribution system.
6 items to check
The retained system should be physically sound and serviceable.
Leakage assessment should follow the project program, code, or accepted test method.
Duct and filter resistance should remain within equipment performance limits.
Distribution should support room loads and door-closed operation.
Duct work should not spread pollutants or create unsafe pressure effects.
The owner should know what remains and how results will be verified.
Use before equipment order or installation when existing ducts will remain. ENERGY STAR advises evaluating ducts because leakage and poor airflow can waste energy, reduce comfort, and shorten equipment life. Do not open energized equipment, handle refrigerant, defeat safety controls, or enter unsafe attics or crawlspaces. Require licensed or qualified HVAC and electrical work where applicable.
A homeowner review checklist for confirming that heating and cooling loads use the actual home, climate, envelope, infiltration, ventilation, duct location, room-by-room needs, design temperatures, internal gains, and equipment performance before HVAC or heat-pump equipment is ordered.
A pre-startup heat-pump installation checklist for matched equipment, mounting and clearances, refrigerant line set, electrical service, condensate, ducts, filters, sensors, controls, auxiliary heat, weather protection, penetrations, and permit readiness before the system is energized and commissioned.
An apples-to-apples HVAC replacement proposal checklist for equipment capacity and efficiency, load-calculation basis, ducts, electrical work, refrigerant lines, condensate, controls, permits, removal, commissioning, warranties, rebates, schedule, and payment terms before contractor selection.
A focused pre-startup checklist for HVAC branch circuits, disconnects, grounding, control wiring, thermostat configuration, condensate routing and overflow devices, pumps, auxiliary heat, interlocks, sensors, labels, and inspection status before energization.