Skip to content
🌧️

Exterior water management

US pre-cover checks for window and door openings, sill pans, flashing integration, weather-resistive barriers, roof-to-wall and deck-ledger flashing, siding penetrations, and buried downspout connections before trim, siding, roofing, or soil hides the work.

Window rough opening before installation checklist

A pre-installation window rough-opening checklist for product and method, opening size and shape, sill support and slope, framing and structural condition, rot and moisture, sheathing, drainage-plane access, interior and exterior clearances, safety glazing and egress implications, and documented repairs before the window is set.

Open checklist

Window sill pan before setting the window checklist

A pre-setting window sill-pan checklist for approved pan type, positive drainage, end dams and back dam where required, corner continuity, substrate preparation, compatible primer and membrane, fastener and shim zones, integration with the weather-resistive barrier, weep path, cure, and photographic evidence.

Open checklist

Window flashing integration before exterior trim checklist

A pre-trim window flashing checklist for jamb and head flashing, sill-pan outlet, weather-resistive barrier laps, head flashing or drip cap, compatible sealants, fin or frame fasteners, weeps, cladding clearances, interior air sealing, water-test planning, and photographic evidence before exterior trim or siding hides the assembly.

Open checklist

Exterior door sill pan before setting the door checklist

A pre-setting exterior-door sill-pan checklist for opening condition, support and level, pan slope and end dams, threshold bearing, drainage outlet, membrane continuity, jamb transitions, compatible sealants, fastener zones, accessibility and finish-height coordination, and documentation before the door frame conceals the sill.

Open checklist

Weather-resistive barrier before siding checklist

A pre-siding weather-resistive-barrier checklist for substrate condition, membrane type and orientation, shingle-lapped seams, corners, openings, penetrations, kickout and roof intersections, base drainage, fastener damage, transition membranes, rainscreen or drainage gaps, temporary exposure, and photographic evidence before cladding hides the wall.

Open checklist

Roof-to-wall and deck-ledger flashing before cover checklist

A pre-cover flashing checklist for roof-to-wall step and kickout flashing, deck-ledger water management, wall and roof membrane integration, end conditions, fasteners, siding and roofing clearances, penetrations, corrosion compatibility, drainage path, structural attachment separation, and photographs before shingles, siding, or decking hides the details.

Open checklist

Siding penetrations before sealant and trim checklist

A pre-finish siding penetration checklist for electrical and plumbing penetrations, hose bibs, vents, lights, cameras, meters, condensate lines, mounting blocks, flashing, drainage-plane integration, structural support, clearances, fire and pest control, sealant joint design, and documentation before trim and surface caulk hide the details.

Open checklist

Downspout underground connection before burial checklist

A pre-burial downspout and yard-drain checklist for approved discharge location, pipe type and size, inlet adapters, cleanouts, slope, bedding, joints, solid versus perforated pipe, foundation and utility clearance, freeze and surcharge risk, daylight or storm connection, erosion protection, tracer or route records, and testing before soil hides the system.

Open checklist