Window product, installation method, wall type, and opening match the approved scope
Critical itemFull-frame, fin, insert, masonry, buck, and other methods require different opening and drainage details.
A pre-installation window rough-opening checklist for product and method, opening size and shape, sill support and slope, framing and structural condition, rot and moisture, sheathing, drainage-plane access, interior and exterior clearances, safety glazing and egress implications, and documented repairs before the window is set.
6 items to check
Full-frame, fin, insert, masonry, buck, and other methods require different opening and drainage details.
The frame should fit with required clearances and shimming without distortion.
Framing should provide approved load support and fastening without concealed decay or unapproved cuts.
New flashing should not conceal active damage or contaminated material.
The opening should allow shingle-lapped or approved integration with the wall drainage plane.
The owner should retain proof of the concealed opening condition.
Use after the old window and trim are removed or the new opening is framed but before the replacement unit, sill pan, or flashing hides existing conditions. Do not use unsafe ladders, walk roofs, remove structural support, or disturb lead, asbestos, or mold-containing assemblies. Require qualified building-envelope, structural, roofing, window, door, and siding professionals where appropriate.
A pre-setting window sill-pan checklist for approved pan type, positive drainage, end dams and back dam where required, corner continuity, substrate preparation, compatible primer and membrane, fastener and shim zones, integration with the weather-resistive barrier, weep path, cure, and photographic evidence.
Final inspection for replacement-window sizing, opening condition, support, fastening, flashing, drainage, air sealing, operation, glass, exterior and interior finishes, and documentation.
A pre-trim window flashing checklist for jamb and head flashing, sill-pan outlet, weather-resistive barrier laps, head flashing or drip cap, compatible sealants, fin or frame fasteners, weeps, cladding clearances, interior air sealing, water-test planning, and photographic evidence before exterior trim or siding hides the assembly.
A pre-setting exterior-door sill-pan checklist for opening condition, support and level, pan slope and end dams, threshold bearing, drainage outlet, membrane continuity, jamb transitions, compatible sealants, fastener zones, accessibility and finish-height coordination, and documentation before the door frame conceals the sill.