Sheathing is sound and WRB coverage, orientation, and exposure are correct
Critical itemThe membrane should be applied to a suitable substrate and within product exposure limits.
A pre-siding weather-resistive-barrier checklist for substrate condition, membrane type and orientation, shingle-lapped seams, corners, openings, penetrations, kickout and roof intersections, base drainage, fastener damage, transition membranes, rainscreen or drainage gaps, temporary exposure, and photographic evidence before cladding hides the wall.
6 items to check
The membrane should be applied to a suitable substrate and within product exposure limits.
Laps and tapes should follow the product and wall assembly without reverse-lapped paths.
Opening flashings should connect to the drainage plane without sealed-in water.
The drainage plane should terminate or transition at adjacent assemblies with approved flashing and clearances.
The wall assembly should preserve intended drainage and ventilation while transferring cladding loads.
Every elevation should be documented because defects become inaccessible.
Use after wall sheathing and WRB installation but before siding, masonry veneer, stucco, exterior insulation, or trim conceals the drainage plane. Do not use unsafe ladders, walk roofs, remove structural support, or disturb lead, asbestos, or mold-containing assemblies. Require qualified building-envelope, structural, roofing, window, door, and siding professionals where appropriate.
A pre-trim window flashing checklist for jamb and head flashing, sill-pan outlet, weather-resistive barrier laps, head flashing or drip cap, compatible sealants, fin or frame fasteners, weeps, cladding clearances, interior air sealing, water-test planning, and photographic evidence before exterior trim or siding hides the assembly.
A pre-finish siding penetration checklist for electrical and plumbing penetrations, hose bibs, vents, lights, cameras, meters, condensate lines, mounting blocks, flashing, drainage-plane integration, structural support, clearances, fire and pest control, sealant joint design, and documentation before trim and surface caulk hide the details.
A pre-installation window rough-opening checklist for product and method, opening size and shape, sill support and slope, framing and structural condition, rot and moisture, sheathing, drainage-plane access, interior and exterior clearances, safety glazing and egress implications, and documented repairs before the window is set.
A pre-setting window sill-pan checklist for approved pan type, positive drainage, end dams and back dam where required, corner continuity, substrate preparation, compatible primer and membrane, fastener and shim zones, integration with the weather-resistive barrier, weep path, cure, and photographic evidence.