Discharge route and outlet are approved and do not harm the building or neighboring property
Critical itemRoof water should reach an allowed location without foundation return, erosion, nuisance flow, or prohibited sewer connection.
A pre-burial downspout and yard-drain checklist for approved discharge location, pipe type and size, inlet adapters, cleanouts, slope, bedding, joints, solid versus perforated pipe, foundation and utility clearance, freeze and surcharge risk, daylight or storm connection, erosion protection, tracer or route records, and testing before soil hides the system.
6 items to check
Roof water should reach an allowed location without foundation return, erosion, nuisance flow, or prohibited sewer connection.
The system should convey roof water and remain maintainable.
Buried pipe should drain or function as designed without bellies, crushing, or settlement.
Connections should not disconnect, leak against the foundation, or admit excessive debris.
The installed route should be tested before burial when safe and permitted.
The owner should be able to locate and service the buried system.
Use after buried roof-drain piping is installed but before trench backfill, landscaping, or hardscape conceals it. Stormwater discharge rules and allowed connections vary locally. Do not use unsafe ladders, walk roofs, remove structural support, or disturb lead, asbestos, or mold-containing assemblies. Require qualified building-envelope, structural, roofing, window, door, and siding professionals where appropriate.
Inspection checklist for gutter alignment, support, seams, outlets, downspouts, roof and fascia interfaces, discharge, drainage, overflow, leak testing, cleanup, and documentation.
Final inspection checklist for grading, drainage paths, soil, planting, hardscape interfaces, utilities, erosion control, irrigation coordination, cleanup, and contractor closeout.
A pre-installation window rough-opening checklist for product and method, opening size and shape, sill support and slope, framing and structural condition, rot and moisture, sheathing, drainage-plane access, interior and exterior clearances, safety glazing and egress implications, and documented repairs before the window is set.
A pre-setting window sill-pan checklist for approved pan type, positive drainage, end dams and back dam where required, corner continuity, substrate preparation, compatible primer and membrane, fastener and shim zones, integration with the weather-resistive barrier, weep path, cure, and photographic evidence.