Wall, roof, ledger, sheathing, and framing conditions are sound before flashing
Critical itemFlashing should not conceal rot, failed prior repairs, or structural damage.
A pre-cover flashing checklist for roof-to-wall step and kickout flashing, deck-ledger water management, wall and roof membrane integration, end conditions, fasteners, siding and roofing clearances, penetrations, corrosion compatibility, drainage path, structural attachment separation, and photographs before shingles, siding, or decking hides the details.
6 items to check
Flashing should not conceal rot, failed prior repairs, or structural damage.
Water should be directed away from the wall and into the drainage system rather than behind cladding.
The ledger connection should not trap water or depend solely on exposed caulk.
Materials should resist corrosion and chemical incompatibility in the actual exposure.
Finishes should not bridge or bury flashing outlets.
Adjacent trades should not cover the interface until both structural and water-management checks pass.
Use where a roof meets a wall or a deck ledger attaches to a building, before adjacent finishes conceal the interfaces. Structural ledger attachment and roof waterproofing should be reviewed separately but coordinated. Do not use unsafe ladders, walk roofs, remove structural support, or disturb lead, asbestos, or mold-containing assemblies. Require qualified building-envelope, structural, roofing, window, door, and siding professionals where appropriate.
A pre-siding weather-resistive-barrier checklist for substrate condition, membrane type and orientation, shingle-lapped seams, corners, openings, penetrations, kickout and roof intersections, base drainage, fastener damage, transition membranes, rainscreen or drainage gaps, temporary exposure, and photographic evidence before cladding hides the wall.
A concealed-detail checklist before shingles, siding, trim, counterflashing, or sealant hide roof valleys, sidewalls, headwalls, kickout flashing, chimneys, skylights, pipe boots, vents, penetrations, and low-slope transitions.
A pre-installation window rough-opening checklist for product and method, opening size and shape, sill support and slope, framing and structural condition, rot and moisture, sheathing, drainage-plane access, interior and exterior clearances, safety glazing and egress implications, and documented repairs before the window is set.
A pre-setting window sill-pan checklist for approved pan type, positive drainage, end dams and back dam where required, corner continuity, substrate preparation, compatible primer and membrane, fastener and shim zones, integration with the weather-resistive barrier, weep path, cure, and photographic evidence.