Skip to content
🏠

Roof replacement

US-focused checklists for ordering a roof replacement, reviewing concealed work after tear-off, verifying underlayment, flashing and ventilation, accepting asphalt shingles, and closing out payment and warranties.

Roof replacement scope and bid comparison checklist

An apples-to-apples US roof replacement bid checklist for roof measurements, tear-off, decking allowances, shingles and system accessories, flashing, ventilation, permits, cleanup, warranties, schedule, and payment terms before contractor selection.

Open checklist

Roof replacement pre-job readiness checklist

A US preconstruction checklist after contract signing and before roof material delivery or tear-off, covering the final order, permit, insurance, products, decking authorization, staging, property protection, weather plan, inspection hold points, communication, and payment controls.

Open checklist

Roof deck condition after tear-off checklist

A concealed-stage checklist after old roofing is removed and before underlayment covers the roof deck, focused on full exposure, sheathing or plank condition, moisture and leak evidence, support and fastening, documented replacement quantities, structural escalation, and approval to proceed.

Open checklist

Roof underlayment, ice barrier, and drip edge before shingles checklist

A pre-cover roof dry-in checklist for a clean accepted deck, approved underlayment and ice barrier, climate and code applicability, laps and fastening, eave and rake drip-edge sequence, penetrations, weather exposure, damage, and concealed-stage documentation before shingles.

Open checklist

Roof flashing details before cover checklist

A concealed-detail checklist before shingles, siding, trim, counterflashing, or sealant hide roof valleys, sidewalls, headwalls, kickout flashing, chimneys, skylights, pipe boots, vents, penetrations, and low-slope transitions.

Open checklist

Attic ventilation during roof replacement checklist

A roof-replacement ventilation checklist for confirming vented versus unvented attic design, adopted-code or approved net-free-area calculation, balanced intake and exhaust, open soffit airflow, exhaust placement, bath and dryer terminations, baffles, product compatibility, and documentation.

Open checklist

Asphalt shingle roof final acceptance checklist

A final acceptance checklist for a US asphalt-shingle replacement roof, covering the ordered product and color, starter and field layout, fastening evidence, valleys and flashings, penetrations, hips and ridges, ventilation, visible damage, attic observations, cleanup, punch list, and correction records.

Open checklist

Roof replacement closeout and final payment checklist

A roof-specific US closeout checklist before final payment, covering completed technical punch items, permit and final inspection status, product and workmanship warranties, manufacturer registration, final decking and change-order quantities, invoice reconciliation, lien releases, cleanup, property damage, maintenance records, and storm documentation.

Open checklist