Roof flashing details before cover checklist

A concealed-detail checklist before shingles, siding, trim, counterflashing, or sealant hide roof valleys, sidewalls, headwalls, kickout flashing, chimneys, skylights, pipe boots, vents, penetrations, and low-slope transitions.

6 items to check

Inspection progress0 of 6
0%

Valley substrate, membrane, metal or shingle method, and terminations are prepared correctly

Critical item

Valley method, deck condition, membrane, metal where used, laps, fastening zones, transitions, upper termination, lower discharge, and roofing layout should follow the approved method and manufacturer instructions.

Sidewall step flashing and bottom kickout direct water onto the roof or into drainage

Critical item

At roof-to-wall sidewalls, individual step flashing, wall weather barrier and counterflashing or siding relationship, laps, height, and kickout at the lower termination should create a shingle-style drainage path.

Headwalls and chimneys have base flashing, side steps, back-pan or cricket, and counterflashing as required

Critical item

Headwall and chimney flashing should use a coordinated water-shedding system appropriate to the geometry, width, slope, masonry condition, adopted requirements, and approved details rather than relying on exposed sealant as the primary defense.

Skylights, curbs, hatches, and mounted equipment use the correct flashing kit and elevation

Critical item

Unit condition, curb height, orientation, deck opening, membrane, sill, jamb, head flashing, diverters, fasteners, and roof-covering integration should follow the exact product, roof slope, and approved installation method.

Pipe boots, roof vents, exhaust terminals, mounts, and abandoned penetrations are properly integrated

Critical item

Each penetration should use a compatible listed or approved flashing assembly, correct opening and support, shingle-style membrane integration, required clearances, and a durable treatment of fasteners and upper and lower flanges.

Every concealed flashing location is photographed, corrected, and released before cover

The project record should identify the location, product, sequence, and completed condition of concealed flashings and any reused component, special repair, manufacturer detail, or inspection approval.

Use this checklist after flashing components and membranes are installed enough to inspect but before roof covering or adjacent finishes conceal the water-shedding sequence. It does not replace a masonry, structural, skylight, or manufacturer specialist inspection. Do not walk a steep, wet, fragile, icy, or otherwise unsafe roof. Use ground-level observation, attic access where safe, dated contractor stage photos, permit inspections, and a qualified independent roof inspector when direct access is needed.

Reference standards

  • Approved plans and specifications, adopted state and local building code, permit and inspection conditions, authority having jurisdiction requirements, selected roof-system manufacturer installation instructions, and the signed contract
  • Adopted flashing provisions and approved roof, wall, chimney, skylight, curb, and penetration details
  • Selected roof-covering, flashing, membrane, skylight, pipe boot, vent, sealant, siding, and masonry manufacturer instructions
  • Tools

  • Signed contract, proposal, roof diagram or measurement report, product selections, permit, and approved change orders
  • Ground-level camera or binoculars, attic flashlight and moisture meter where safe, and dated contractor stage photos
  • Manufacturer installation and warranty documents plus inspection, delivery, invoice, and cleanup records