Attic ventilation during roof replacement checklist

A roof-replacement ventilation checklist for confirming vented versus unvented attic design, adopted-code or approved net-free-area calculation, balanced intake and exhaust, open soffit airflow, exhaust placement, bath and dryer terminations, baffles, product compatibility, and documentation.

6 items to check

Inspection progress0 of 6
0%

The project identifies a vented attic, vented rafter space, or approved unvented roof assembly

Critical item

Vent openings should not be added or removed until the intended thermal, air, and moisture-control assembly is known. An unvented assembly requires its own approved insulation, air-control, and moisture design rather than accidental partial ventilation.

Required ventilation and net-free area are calculated from applicable rules and actual products

Critical item

The design should use the adopted code or approved design criteria, actual vented area, manufacturer net-free-area values, and any conditions for intake and exhaust distribution. A generic count of vents is not a calculation.

Continuous intake path is open from exterior vents into each intended attic or rafter bay

Critical item

Soffit, eave, edge, or other approved intake vents should remain open, protected, and connected to the vented space without blockage by insulation, paint, debris, framing, solid blocking, or incompatible retrofit details.

Exhaust type, location, capacity, and roof cuts create a coordinated high-level outlet

Critical item

Ridge, box, off-ridge, turbine, powered, or other exhaust vents should be compatible with the roof and attic geometry, placed to serve the intended space, cut and fastened as instructed, and coordinated to avoid short-circuiting or weather entry.

Bathroom, kitchen, dryer, and combustion exhausts terminate correctly and remain separate from attic ventilation

Critical item

Mechanical and appliance exhaust systems should follow their adopted requirements and manufacturer instructions, terminate at approved exterior locations, remain connected and supported, and not discharge moisture, lint, grease, or combustion products into the attic or ordinary roof vent system.

Final intake and exhaust schedule, attic observations, and owner maintenance record are complete

The owner should receive an as-built record of active and abandoned vents, product models and net-free areas, calculation basis, attic photos, baffles and insulation corrections, mechanical exhaust terminals, and maintenance limitations.

Use this checklist before cutting new roof vents or closing the roof system. Ventilation is not improved simply by adding more exhaust openings. The correct approach depends on whether the assembly is designed as a vented attic or an unvented roof, the adopted code, air sealing and insulation, roof geometry, climate, and selected roof and vent manufacturers.

Reference standards

  • Approved plans and specifications, adopted state and local building code, permit and inspection conditions, authority having jurisdiction requirements, selected roof-system manufacturer installation instructions, and the signed contract
  • Adopted IRC or local attic and enclosed-rafter ventilation provisions and any approved unvented-assembly design
  • Vent, shingle, soffit, baffle, insulation, air-sealing, bath-exhaust, dryer-exhaust, and mechanical-equipment manufacturer instructions
  • Tools

  • Attic and roof plan with measured vented area, each intake and exhaust product, and manufacturer net-free-area data
  • Safe attic access, flashlight, camera, smoke or airflow diagnostic used only where appropriate, and exterior observation
  • Approved calculation, existing-condition photos, product labels, and final as-built vent schedule