Base cabinets, island, panels, fillers, end conditions, supports, and appliances affecting template are installed, secured, level, and adjusted
Critical itemThe template should represent the final stable support geometry.
A pre-template countertop checklist for installed and adjusted base cabinets, secure island and supports, level and plane, finished panels and fillers, wall and backsplash conditions, exact slab or surface selection, seam and pattern plan, edge and overhang, brackets, sink and cooktop models, faucet and accessory holes, appliance clearances, waterfall and end conditions, plumbing and electrical coordination, field changes, access, fabrication tolerances, responsibility for final verification, and written release before irreversible cutting.
6 items to check
The template should represent the final stable support geometry.
Fabrication should follow a documented aesthetic and structural layout.
Cutouts and holes should use current manufacturer templates and approved field relationships.
Template should account for realistic out-of-square conditions and required appliance gaps without unsafe field alteration.
Stone or surface loads and openings should remain supported and serviceable.
Irreversible fabrication should begin only after measured conditions and selected details are signed off.
Use immediately before digital or physical templating. Fabrication should not proceed from unstable cabinets, missing panels, unapproved appliance models, unresolved seams, or verbal cutout assumptions. Do not energize exposed work, open or test gas piping, pressure-test plumbing, operate incomplete appliances, enter unsafe framing or attics, or modify structure without authorization. Licensed trades and the AHJ control required tests and approvals.
A pre-order kitchen appliance checklist for exact model and revision, availability and substitution plan, cabinet cutout and ventilation dimensions, door and drawer swing, handle and hinge clearances, panel-ready requirements, trim kits and fillers, utility type and location, electrical load and protective devices, gas fuel and connector space, water and drain needs, hood capture and duct, anti-tip and anchorage, countertop and backsplash interfaces, service and replacement access, delivery path, warranty, and written release before cabinets and stone are fabricated.
Final inspection for countertop support, seams, overhangs, cutouts, sink and faucet openings, backsplash interfaces, sealants, surface damage, and care documentation.
A pre-rough-in kitchen layout checklist for finished-wall dimensions, cabinet and filler geometry, appliance models and openings, door and drawer collisions, work aisles and landing areas, sink and cooktop locations, ventilation capture, service access, accessibility goals, floor and countertop buildup, island position, structural support, utilities, and written approval before plumbing, wiring, gas, ductwork, blocking, or cabinet ordering locks in the plan.
A pre-cover kitchen plumbing checklist for sink and appliance locations, water and drainage sizing and routing, venting, cleanouts, slope, supports, shutoffs, refrigerator and dishwasher supplies, disposal and filtration space, island vent method, protection plates, fireblocking, insulation and freeze protection, pressure and drainage tests, inspection approval, and full route photographs before walls, floors, cabinets, or insulation hide the work.