Exact manufacturer, model, revision, fuel, finish, handedness, panel kit, and availability are confirmed
Critical itemOrdering and fabrication should use current official documents for the products actually being supplied.
A pre-order kitchen appliance checklist for exact model and revision, availability and substitution plan, cabinet cutout and ventilation dimensions, door and drawer swing, handle and hinge clearances, panel-ready requirements, trim kits and fillers, utility type and location, electrical load and protective devices, gas fuel and connector space, water and drain needs, hood capture and duct, anti-tip and anchorage, countertop and backsplash interfaces, service and replacement access, delivery path, warranty, and written release before cabinets and stone are fabricated.
6 items to check
Ordering and fabrication should use current official documents for the products actually being supplied.
Built openings should support installation, cooling, use, and removal without unsafe field cutting.
Utilities should be correctly sized and located outside prohibited or interference zones.
Equipment should be supported and restrained according to listing and instructions.
The completed kitchen should allow safe delivery, connection, commissioning, maintenance, and future replacement.
Cabinet and countertop release should use one locked equipment baseline and a written reapproval process for changes.
Use before releasing cabinet shop drawings, ordering semi-custom or custom cabinets, approving appliance panels, or committing countertop openings. Actual manufacturer installation instructions and local requirements control dimensions and utilities. Do not energize exposed work, open or test gas piping, pressure-test plumbing, operate incomplete appliances, enter unsafe framing or attics, or modify structure without authorization. Licensed trades and the AHJ control required tests and approvals.
A pre-rough-in kitchen layout checklist for finished-wall dimensions, cabinet and filler geometry, appliance models and openings, door and drawer collisions, work aisles and landing areas, sink and cooktop locations, ventilation capture, service access, accessibility goals, floor and countertop buildup, island position, structural support, utilities, and written approval before plumbing, wiring, gas, ductwork, blocking, or cabinet ordering locks in the plan.
A pre-template countertop checklist for installed and adjusted base cabinets, secure island and supports, level and plane, finished panels and fillers, wall and backsplash conditions, exact slab or surface selection, seam and pattern plan, edge and overhang, brackets, sink and cooktop models, faucet and accessory holes, appliance clearances, waterfall and end conditions, plumbing and electrical coordination, field changes, access, fabrication tolerances, responsibility for final verification, and written release before irreversible cutting.
A pre-cover kitchen plumbing checklist for sink and appliance locations, water and drainage sizing and routing, venting, cleanouts, slope, supports, shutoffs, refrigerator and dishwasher supplies, disposal and filtration space, island vent method, protection plates, fireblocking, insulation and freeze protection, pressure and drainage tests, inspection approval, and full route photographs before walls, floors, cabinets, or insulation hide the work.
A pre-drywall kitchen electrical checklist for approved load and circuit plan, appliance nameplates, service capacity, dedicated and shared circuits, receptacle and countertop outlet layout, island and peninsula provisions, GFCI and AFCI strategy as locally required, lighting and switching, hood and disposal controls, boxes and supports, grounding and bonding, structural protection, working clearances, inspection approval, labels, and complete photographs before finishes and cabinets conceal the wiring.