Kitchen plumbing rough-in before wall close-up checklist

A pre-cover kitchen plumbing checklist for sink and appliance locations, water and drainage sizing and routing, venting, cleanouts, slope, supports, shutoffs, refrigerator and dishwasher supplies, disposal and filtration space, island vent method, protection plates, fireblocking, insulation and freeze protection, pressure and drainage tests, inspection approval, and full route photographs before walls, floors, cabinets, or insulation hide the work.

6 items to check

Inspection progress0 of 6
0%

Sink, faucet, dishwasher, disposal, refrigerator, icemaker, filter, pot filler, and specialty connections match actual products

Critical item

Rough-ins should land inside usable service zones without blocking cabinets, drawers, supports, or appliance installation.

Drain, trap arm, vent, island venting, cleanouts, slope, and branch connections follow the approved layout

Critical item

Drainage should remain vented, maintainable, supported, and compatible with structure and cabinets.

Hot, cold, appliance, treatment, recirculation, and shutoff piping are supported and serviceable

Critical item

Water lines and valves should suit pressure, temperature, material, fixture demand, and future isolation.

Structural penetrations, nail plates, sleeves, fireblocking, air sealing, insulation, freeze protection, and acoustic isolation are complete

Critical item

Trade routing should protect structure and piping and restore required assemblies.

Pressure, leak, drainage, vent, and required rough inspection records are accepted

Critical item

Piping should pass the applicable test before fixtures, appliances, cabinets, or finishes conceal it.

Square-on photographs, dimensions, valve map, product centers, and close-up release are saved

Future installers and owners should be able to locate concealed piping and avoid fastener damage.

Use after kitchen plumbing rough-in and tests but before close-up. Actual fixtures, appliances, cabinets, structure, and locally approved island-vent method control the arrangement. Do not energize exposed work, open or test gas piping, pressure-test plumbing, operate incomplete appliances, enter unsafe framing or attics, or modify structure without authorization. Licensed trades and the AHJ control required tests and approvals.

Reference standards

  • Approved kitchen and structural plans, appliance and cabinet specifications, adopted state and local building, residential, plumbing, fuel-gas, mechanical, electrical, energy, fire, accessibility, and health requirements, permit and inspection conditions, authority having jurisdiction requirements, signed scope and authorized changes, qualified design, and exact cabinet, countertop, appliance, ventilation, piping, wiring, fastening, and finish manufacturer instructions
  • Fixture and appliance rough-in sheets, approved plumbing design, selected piping-system instructions, test procedure, and cabinet and countertop plans
  • Tools

  • Current kitchen plan, elevations, appliance and fixture specifications, cabinet drawings, countertop details, permits, inspection records, selections, and change orders
  • Tape measure, level, camera, flashlight, product templates, owner-safe test tools, and dated photographs with dimensions
  • Qualified plumbing, gas, electrical, mechanical, cabinet, countertop, appliance, structural, and commissioning records where required
  • Related Checklists

    Kitchen layout and appliance clearances before rough-in checklist

    A pre-rough-in kitchen layout checklist for finished-wall dimensions, cabinet and filler geometry, appliance models and openings, door and drawer collisions, work aisles and landing areas, sink and cooktop locations, ventilation capture, service access, accessibility goals, floor and countertop buildup, island position, structural support, utilities, and written approval before plumbing, wiring, gas, ductwork, blocking, or cabinet ordering locks in the plan.

    Kitchen electrical rough-in before drywall checklist

    A pre-drywall kitchen electrical checklist for approved load and circuit plan, appliance nameplates, service capacity, dedicated and shared circuits, receptacle and countertop outlet layout, island and peninsula provisions, GFCI and AFCI strategy as locally required, lighting and switching, hood and disposal controls, boxes and supports, grounding and bonding, structural protection, working clearances, inspection approval, labels, and complete photographs before finishes and cabinets conceal the wiring.

    Kitchen gas piping before concealment checklist

    A pre-cover kitchen fuel-gas checklist for approved appliance and fuel, pipe material and sizing, route and structural penetrations, supports, corrosion and sleeve protection, shutoff and connector location, sediment or appliance-specific details where required, bonding and electrical coordination, pressure-test records, leak-test responsibility, combustion air and ventilation interactions, inspection approval, labels, and photographs before walls, floors, cabinets, or appliances conceal the system.

    Range-hood duct before ceiling and cabinets checklist

    A pre-concealment residential range-hood checklist for actual hood and cooking appliance, capture and mounting geometry, duct material and size, equivalent length and fittings, joint fastening and sealing, support, fire and structural penetrations, route cleanliness, exterior termination, damper access, weather and pest protection, makeup air and combustion interactions where applicable, electrical coordination, inspection approval, airflow commissioning plan, and photographs before ceilings, soffits, cabinets, roofing, or siding hide the exhaust path.