All dimensions are tied to finished walls, floors, panels, fillers, and countertop edges
Critical itemLayout should include actual finish buildup and construction tolerances.
A pre-rough-in kitchen layout checklist for finished-wall dimensions, cabinet and filler geometry, appliance models and openings, door and drawer collisions, work aisles and landing areas, sink and cooktop locations, ventilation capture, service access, accessibility goals, floor and countertop buildup, island position, structural support, utilities, and written approval before plumbing, wiring, gas, ductwork, blocking, or cabinet ordering locks in the plan.
6 items to check
Layout should include actual finish buildup and construction tolerances.
Actual installation drawings should control opening, clearance, ventilation, utility, and service dimensions.
Normal use should not create collisions, trapped users, unsafe hot-work paths, or blocked access.
Wet and cooking zones should align with structure, cabinets, windows, utilities, capture area, duct route, and product requirements.
Required access and load transfer should not depend on removing permanent finishes improperly.
Dependent trades should work from one dated baseline.
Use before trade rough-in and before cabinets or countertops are ordered. Field dimensions should be based on finished surfaces and actual selected equipment rather than generic nominal sizes. Do not energize exposed work, open or test gas piping, pressure-test plumbing, operate incomplete appliances, enter unsafe framing or attics, or modify structure without authorization. Licensed trades and the AHJ control required tests and approvals.
A pre-order kitchen appliance checklist for exact model and revision, availability and substitution plan, cabinet cutout and ventilation dimensions, door and drawer swing, handle and hinge clearances, panel-ready requirements, trim kits and fillers, utility type and location, electrical load and protective devices, gas fuel and connector space, water and drain needs, hood capture and duct, anti-tip and anchorage, countertop and backsplash interfaces, service and replacement access, delivery path, warranty, and written release before cabinets and stone are fabricated.
A pre-cover kitchen plumbing checklist for sink and appliance locations, water and drainage sizing and routing, venting, cleanouts, slope, supports, shutoffs, refrigerator and dishwasher supplies, disposal and filtration space, island vent method, protection plates, fireblocking, insulation and freeze protection, pressure and drainage tests, inspection approval, and full route photographs before walls, floors, cabinets, or insulation hide the work.
A pre-drywall kitchen electrical checklist for approved load and circuit plan, appliance nameplates, service capacity, dedicated and shared circuits, receptacle and countertop outlet layout, island and peninsula provisions, GFCI and AFCI strategy as locally required, lighting and switching, hood and disposal controls, boxes and supports, grounding and bonding, structural protection, working clearances, inspection approval, labels, and complete photographs before finishes and cabinets conceal the wiring.
A pre-cover kitchen fuel-gas checklist for approved appliance and fuel, pipe material and sizing, route and structural penetrations, supports, corrosion and sleeve protection, shutoff and connector location, sediment or appliance-specific details where required, bonding and electrical coordination, pressure-test records, leak-test responsibility, combustion air and ventilation interactions, inspection approval, labels, and photographs before walls, floors, cabinets, or appliances conceal the system.