Kitchen layout and appliance clearances before rough-in checklist

A pre-rough-in kitchen layout checklist for finished-wall dimensions, cabinet and filler geometry, appliance models and openings, door and drawer collisions, work aisles and landing areas, sink and cooktop locations, ventilation capture, service access, accessibility goals, floor and countertop buildup, island position, structural support, utilities, and written approval before plumbing, wiring, gas, ductwork, blocking, or cabinet ordering locks in the plan.

6 items to check

Inspection progress0 of 6
0%

All dimensions are tied to finished walls, floors, panels, fillers, and countertop edges

Critical item

Layout should include actual finish buildup and construction tolerances.

Refrigerator, range, cooktop, ovens, dishwasher, microwave, hood, and specialty appliance openings match selected models

Critical item

Actual installation drawings should control opening, clearance, ventilation, utility, and service dimensions.

Doors, drawers, appliances, seating, circulation, landing areas, and work zones can operate together

Critical item

Normal use should not create collisions, trapped users, unsafe hot-work paths, or blocked access.

Sink, faucet, disposal, cooktop, hood, makeup air where applicable, and exhaust route are coordinated

Critical item

Wet and cooking zones should align with structure, cabinets, windows, utilities, capture area, duct route, and product requirements.

Panels, shutoffs, valves, traps, junctions, filters, motors, anchors, and structural supports remain serviceable

Critical item

Required access and load transfer should not depend on removing permanent finishes improperly.

The coordinated plan, product schedule, dimensions, unresolved decisions, and field changes are approved before rough-in

Dependent trades should work from one dated baseline.

Use before trade rough-in and before cabinets or countertops are ordered. Field dimensions should be based on finished surfaces and actual selected equipment rather than generic nominal sizes. Do not energize exposed work, open or test gas piping, pressure-test plumbing, operate incomplete appliances, enter unsafe framing or attics, or modify structure without authorization. Licensed trades and the AHJ control required tests and approvals.

Reference standards

  • Approved kitchen and structural plans, appliance and cabinet specifications, adopted state and local building, residential, plumbing, fuel-gas, mechanical, electrical, energy, fire, accessibility, and health requirements, permit and inspection conditions, authority having jurisdiction requirements, signed scope and authorized changes, qualified design, and exact cabinet, countertop, appliance, ventilation, piping, wiring, fastening, and finish manufacturer instructions
  • Actual appliance, fixture, cabinet, hardware, hood, countertop, sink, faucet, disposal, water-treatment, and accessibility drawings
  • Tools

  • Current kitchen plan, elevations, appliance and fixture specifications, cabinet drawings, countertop details, permits, inspection records, selections, and change orders
  • Tape measure, level, camera, flashlight, product templates, owner-safe test tools, and dated photographs with dimensions
  • Qualified plumbing, gas, electrical, mechanical, cabinet, countertop, appliance, structural, and commissioning records where required
  • Related Checklists

    Kitchen appliance specifications before cabinet order checklist

    A pre-order kitchen appliance checklist for exact model and revision, availability and substitution plan, cabinet cutout and ventilation dimensions, door and drawer swing, handle and hinge clearances, panel-ready requirements, trim kits and fillers, utility type and location, electrical load and protective devices, gas fuel and connector space, water and drain needs, hood capture and duct, anti-tip and anchorage, countertop and backsplash interfaces, service and replacement access, delivery path, warranty, and written release before cabinets and stone are fabricated.

    Kitchen plumbing rough-in before wall close-up checklist

    A pre-cover kitchen plumbing checklist for sink and appliance locations, water and drainage sizing and routing, venting, cleanouts, slope, supports, shutoffs, refrigerator and dishwasher supplies, disposal and filtration space, island vent method, protection plates, fireblocking, insulation and freeze protection, pressure and drainage tests, inspection approval, and full route photographs before walls, floors, cabinets, or insulation hide the work.

    Kitchen electrical rough-in before drywall checklist

    A pre-drywall kitchen electrical checklist for approved load and circuit plan, appliance nameplates, service capacity, dedicated and shared circuits, receptacle and countertop outlet layout, island and peninsula provisions, GFCI and AFCI strategy as locally required, lighting and switching, hood and disposal controls, boxes and supports, grounding and bonding, structural protection, working clearances, inspection approval, labels, and complete photographs before finishes and cabinets conceal the wiring.

    Kitchen gas piping before concealment checklist

    A pre-cover kitchen fuel-gas checklist for approved appliance and fuel, pipe material and sizing, route and structural penetrations, supports, corrosion and sleeve protection, shutoff and connector location, sediment or appliance-specific details where required, bonding and electrical coordination, pressure-test records, leak-test responsibility, combustion air and ventilation interactions, inspection approval, labels, and photographs before walls, floors, cabinets, or appliances conceal the system.