Roof covering, deck, flashing, age, remaining life, and prior defects are acceptable for solar
Critical itemPanels should not conceal a roof that requires near-term repair or incompatible attachment.
A pre-panel residential solar checklist for roof age and condition, structural and layout approval, attachment type and spacing, rafter or approved substrate engagement, roof-covering compatibility, flashing and seal details, underlayment integration, corrosion compatibility, conduit and wire routes, setbacks and access paths, attic evidence, water-management photographs, and coordination with roof warranties before modules hide the attachments.
6 items to check
Panels should not conceal a roof that requires near-term repair or incompatible attachment.
Loads and attachment spacing should follow approved structural and permit documents.
Mounts should transfer loads to the designed substrate rather than sheathing alone unless specifically approved.
Attachments should preserve roof water shedding without relying solely on exposed sealant.
Components should resist corrosion, abrasion, heat, water entry, and inaccessible routing.
The owner should retain evidence for leak and warranty questions after modules conceal the work.
Use after solar roof attachments and flashing are installed but before rails, modules, or skirts conceal them. DOE consumer guidance recommends confirming roof suitability and age before solar installation. Do not remove electrical covers, operate unapproved equipment, test energized conductors, backfeed circuits, or bypass interlocks. Service, panel, EV, generator, solar, and battery work must be performed and inspected by qualified persons where required.
A concealed-stage checklist after old roofing is removed and before underlayment covers the roof deck, focused on full exposure, sheathing or plank condition, moisture and leak evidence, support and fastening, documented replacement quantities, structural escalation, and approval to proceed.
A solar closeout checklist for installed modules and inverter models, DC and AC wiring, rapid shutdown and disconnects, grounding and bonding, labels, monitoring, production test, battery or generator interactions, permit final, utility interconnection and permission to operate, net-metering account, warranties, installer and financier access, cybersecurity, roof documentation, and owner emergency procedures before final payment.
An apples-to-apples electrical service or panel proposal checklist for load calculation, utility requirements, service rating, meter and mast work, panel type and location, feeder and grounding scope, surge and protective devices, circuits and directory, patching, permits, outage planning, future EV or heat-pump capacity, warranties, and payment terms before contractor selection.
A pre-energization electrical service and panel checklist for approved equipment, service conductors and raceways, meter and disconnect, panel mounting and clearances, feeders, neutral and grounding separation, grounding electrode and bonding, breaker compatibility, conductor protection, labeling, unused openings, surge and protective devices, utility release, permits, and photographic evidence before power is restored.