Battery, inverter or gateway, capacity, chemistry, operating mode, and backup scope match approvals
Critical itemInstalled equipment and intended whole-home or selected-load operation should be explicit.
A pre-commissioning residential battery checklist for approved chemistry and capacity, indoor or outdoor location, fire and structural requirements, environmental and impact protection, working clearances, service and ventilation needs, conductors and disconnects, grounding, overcurrent and rapid-shutdown interactions, backup-load panel, solar and generator coordination, communications, internet and cybersecurity, utility approval, emergency labels, commissioning plan, warranty, and owner handover.
6 items to check
Installed equipment and intended whole-home or selected-load operation should be explicit.
The installation should comply with approved fire, building, electrical, and product location requirements.
Multiple power sources should be clearly separated and safely controlled.
Control strategy should avoid overload, unsafe islanding, and conflicting sources.
The owner should control accounts and understand local and cloud operation.
Commissioning should demonstrate charge, discharge, transfer, recovery, and fault-free operation before final payment.
Use after stationary storage equipment is installed but before commissioning and normal operation. Battery location and fire-code requirements vary, and utility involvement may be required. Do not remove electrical covers, operate unapproved equipment, test energized conductors, backfeed circuits, or bypass interlocks. Service, panel, EV, generator, solar, and battery work must be performed and inspected by qualified persons where required.
A solar closeout checklist for installed modules and inverter models, DC and AC wiring, rapid shutdown and disconnects, grounding and bonding, labels, monitoring, production test, battery or generator interactions, permit final, utility interconnection and permission to operate, net-metering account, warranties, installer and financier access, cybersecurity, roof documentation, and owner emergency procedures before final payment.
A residential standby or portable-generator connection checklist for approved generator type and location, fuel and exhaust safety, inlet or transfer equipment, neutral and grounding configuration, interlocks, load selection and shedding, service rating, permits, utility coordination, startup, simulated outage, transfer and retransfer, alarms, carbon-monoxide precautions, maintenance, and owner handover before final acceptance.
An apples-to-apples electrical service or panel proposal checklist for load calculation, utility requirements, service rating, meter and mast work, panel type and location, feeder and grounding scope, surge and protective devices, circuits and directory, patching, permits, outage planning, future EV or heat-pump capacity, warranties, and payment terms before contractor selection.
A pre-energization electrical service and panel checklist for approved equipment, service conductors and raceways, meter and disconnect, panel mounting and clearances, feeders, neutral and grounding separation, grounding electrode and bonding, breaker compatibility, conductor protection, labeling, unused openings, surge and protective devices, utility release, permits, and photographic evidence before power is restored.