Property, setbacks, easements, building corners, and benchmarks are controlled
Critical itemLayout should be based on authorized survey control and the approved site plan.
A pre-excavation new-home checklist for survey control, setbacks, easements, finished-floor elevation, drainage concept, utility conflicts, access, erosion control, tree and property protection, soil information, excavation limits, and documentation before irreversible site work begins.
6 items to check
Layout should be based on authorized survey control and the approved site plan.
The planned building and site elevations should direct water safely and coordinate with streets, neighbors, utilities, and required flood or drainage criteria.
Foundation and earthwork decisions should use project-appropriate geotechnical information and documented field conditions.
Excavation should protect existing services and reserve buildable routes, elevations, separations, and access for proposed utilities.
Site logistics should control sediment, mud, runoff, damage, and unsafe public or worker access.
Irreversible work should begin only after required approvals and a complete baseline record.
Use after permits and approved site documents are available but before clearing, mass grading, footing excavation, or utility trenching materially changes the lot. Survey, geotechnical, civil, structural, utility, and environmental decisions require qualified professionals. Do not enter unsupported excavations, walk incomplete framing or roofs, open energized equipment, operate pressurized systems without authorization, or interfere with required inspections. Use qualified inspectors and licensed trades for inaccessible, structural, electrical, gas, mechanical, environmental, or life-safety conditions.
A pre-contract new-home checklist for plan identity, site and model options, written specifications, allowances, substitutions, exclusions, schedule, inspections, change control, payment milestones, warranty documents, and unresolved assumptions before signing or depositing funds.
A pre-backfill new-home foundation checklist for permit inspections, footing and wall records, dimensions and elevations, reinforcing and anchors, waterproofing or dampproofing, drainage, penetrations, insulation, termite or radon details, utility sleeves, corrections, and complete concealed-work photographs.
A framing-stage new-home checklist for approved structural layout, floor and roof systems, bearing, connectors, braced walls, openings, stairs, fireblocking, moisture condition, dimensional coordination, window and door openings, trade pathways, corrections, and records before plumbing, electrical, and HVAC work modifies the framing.
A coordinated pre-insulation new-home rough-in checklist for approved layouts, structural penetrations, piping and drains, gas and venting, electrical circuits and boxes, HVAC ducts and refrigerant lines, ventilation, fireblocking, testing, inspections, photographs, and correction release before cavities are filled.