Walls, floors, roofs, openings, stairs, and elevations match approved structural and architectural plans
Critical itemThe frame should reflect approved geometry, load paths, room dimensions, openings, and site-specific options.
A framing-stage new-home checklist for approved structural layout, floor and roof systems, bearing, connectors, braced walls, openings, stairs, fireblocking, moisture condition, dimensional coordination, window and door openings, trade pathways, corrections, and records before plumbing, electrical, and HVAC work modifies the framing.
6 items to check
The frame should reflect approved geometry, load paths, room dimensions, openings, and site-specific options.
Member sizes, grades, orientation, bearing lengths, connections, and fasteners should match approved design and product requirements.
Lateral and uplift resistance should remain continuous from roof and floors to foundation.
Wet, split, crushed, decayed, mold-affected, or contaminated materials should be evaluated and corrected before concealment.
Planned penetrations and equipment should fit without unapproved structural modification or inaccessible service conditions.
Rough-ins should begin after structural corrections and required approvals are documented.
Use after the primary structural frame and sheathing are erected but before extensive plumbing, electrical, gas, or HVAC drilling, notching, cutting, and concealment. Do not climb incomplete framing; use safe floor-level observation, contractor photographs, and qualified structural inspection. Do not enter unsupported excavations, walk incomplete framing or roofs, open energized equipment, operate pressurized systems without authorization, or interfere with required inspections. Use qualified inspectors and licensed trades for inaccessible, structural, electrical, gas, mechanical, environmental, or life-safety conditions.
A pre-backfill new-home foundation checklist for permit inspections, footing and wall records, dimensions and elevations, reinforcing and anchors, waterproofing or dampproofing, drainage, penetrations, insulation, termite or radon details, utility sleeves, corrections, and complete concealed-work photographs.
A coordinated pre-insulation new-home rough-in checklist for approved layouts, structural penetrations, piping and drains, gas and venting, electrical circuits and boxes, HVAC ducts and refrigerant lines, ventilation, fireblocking, testing, inspections, photographs, and correction release before cavities are filled.
A pre-contract new-home checklist for plan identity, site and model options, written specifications, allowances, substitutions, exclusions, schedule, inspections, change control, payment milestones, warranty documents, and unresolved assumptions before signing or depositing funds.
A pre-excavation new-home checklist for survey control, setbacks, easements, finished-floor elevation, drainage concept, utility conflicts, access, erosion control, tree and property protection, soil information, excavation limits, and documentation before irreversible site work begins.