Fixture, equipment, panel, device, duct, pipe, vent, and control locations match plans and selections
Critical itemRough-in locations should coordinate with actual products, finishes, structure, cabinets, doors, service access, and owner options.
A coordinated pre-insulation new-home rough-in checklist for approved layouts, structural penetrations, piping and drains, gas and venting, electrical circuits and boxes, HVAC ducts and refrigerant lines, ventilation, fireblocking, testing, inspections, photographs, and correction release before cavities are filled.
6 items to check
Rough-in locations should coordinate with actual products, finishes, structure, cabinets, doors, service access, and owner options.
Trade penetrations should remain within prescriptive or engineered limits and include required protection from future fasteners.
Piping, slope, support, protection, shutoffs, vents, drains, relief paths, and test procedures should meet adopted and product requirements.
Electrical rough-in should match approved load and circuit plans, equipment nameplates, box-fill and support requirements, and required protection locations.
Mechanical rough-in should reflect design airflow, pressure, moisture, combustion, noise, service, and exact equipment requirements.
Cavities should remain open until applicable trade inspections and corrections are accepted and the final hidden-work record is complete.
Use after major rough-in systems are installed and tested but before insulation, air sealing, drywall, cabinets, tubs, or other finishes reduce visibility. Qualified trades and the AHJ control testing and approval; homeowners should not energize, pressurize, or open systems. Do not enter unsupported excavations, walk incomplete framing or roofs, open energized equipment, operate pressurized systems without authorization, or interfere with required inspections. Use qualified inspectors and licensed trades for inaccessible, structural, electrical, gas, mechanical, environmental, or life-safety conditions.
A framing-stage new-home checklist for approved structural layout, floor and roof systems, bearing, connectors, braced walls, openings, stairs, fireblocking, moisture condition, dimensional coordination, window and door openings, trade pathways, corrections, and records before plumbing, electrical, and HVAC work modifies the framing.
A pre-drywall new-home thermal-enclosure checklist for air-barrier continuity, insulation type and R-value, full cavity contact, attic and roof details, rim joists, penetrations, baffles, shafts, tubs and fireplaces, moisture condition, trade protection, required inspections, and photographic evidence before finishes conceal the work.
A pre-contract new-home checklist for plan identity, site and model options, written specifications, allowances, substitutions, exclusions, schedule, inspections, change control, payment milestones, warranty documents, and unresolved assumptions before signing or depositing funds.
A pre-excavation new-home checklist for survey control, setbacks, easements, finished-floor elevation, drainage concept, utility conflicts, access, erosion control, tree and property protection, soil information, excavation limits, and documentation before irreversible site work begins.