Required footing, reinforcement, foundation, utility, and special inspections are documented
Critical itemWork should not be concealed until applicable permit and project inspections are accepted and corrections are closed.
A pre-backfill new-home foundation checklist for permit inspections, footing and wall records, dimensions and elevations, reinforcing and anchors, waterproofing or dampproofing, drainage, penetrations, insulation, termite or radon details, utility sleeves, corrections, and complete concealed-work photographs.
6 items to check
Work should not be concealed until applicable permit and project inspections are accepted and corrections are closed.
Built geometry and support conditions should match approved plans and qualified field changes.
Structural steel and connection hardware should match the approved design, placement tolerances, cover, embedment, and product instructions.
Dampproofing or waterproofing, drainage board, footing drains, aggregate, filter materials, sumps, discharge, and grade interfaces should form the specified system.
Climate, site, code, and project-specific protection layers should remain continuous without creating hidden conflicts.
Backfill should protect the foundation and preserve evidence of all concealed work.
Use after foundation walls, piers, slab edges, waterproofing, drainage, and required inspections are substantially complete but before soil, slabs, porches, decks, or finishes conceal critical conditions. Independent observation does not replace required official inspections or structural design. Do not enter unsupported excavations, walk incomplete framing or roofs, open energized equipment, operate pressurized systems without authorization, or interfere with required inspections. Use qualified inspectors and licensed trades for inaccessible, structural, electrical, gas, mechanical, environmental, or life-safety conditions.
A pre-excavation new-home checklist for survey control, setbacks, easements, finished-floor elevation, drainage concept, utility conflicts, access, erosion control, tree and property protection, soil information, excavation limits, and documentation before irreversible site work begins.
A framing-stage new-home checklist for approved structural layout, floor and roof systems, bearing, connectors, braced walls, openings, stairs, fireblocking, moisture condition, dimensional coordination, window and door openings, trade pathways, corrections, and records before plumbing, electrical, and HVAC work modifies the framing.
A pre-contract new-home checklist for plan identity, site and model options, written specifications, allowances, substitutions, exclusions, schedule, inspections, change control, payment milestones, warranty documents, and unresolved assumptions before signing or depositing funds.
A coordinated pre-insulation new-home rough-in checklist for approved layouts, structural penetrations, piping and drains, gas and venting, electrical circuits and boxes, HVAC ducts and refrigerant lines, ventilation, fireblocking, testing, inspections, photographs, and correction release before cavities are filled.