Plans, selections, permits, and change orders match the completed kitchen
Critical itemThe finished project should match approved documents and authorized changes, with required permit and inspection status documented before final acceptance.
A homeowner closeout checklist for cabinets, countertops, plumbing, electrical, ventilation, appliances, tile, flooring, finishes, documentation, and final payment.
4 items to check
For a complete inspection, also consider:
Focused cabinet layout, fastening, alignment, and hardware inspection.
Countertop support, seams, cutouts, sealing, and damage review.
Backsplash layout, bond, grout, sealant, and device finish checks.
Utilities, anchorage, clearances, venting, and appliance startup.
The finished project should match approved documents and authorized changes, with required permit and inspection status documented before final acceptance.
Utilities and connected equipment should comply with adopted requirements, listings, and manufacturer instructions and should operate without leakage, fault, unsafe heat, or abnormal noise.
Installed finishes should match the approved design, remain properly supported and functional, and be free from unresolved chips, cracks, open joints, loose pieces, binding, contamination, or incomplete adjustment.
The owner should receive the information and materials needed to operate, clean, maintain, and obtain warranty service for the completed kitchen.
Use this checklist near substantial completion and before final payment for a kitchen remodel. Concealed rough-in, structural, electrical, plumbing, gas, and ventilation work should already have received required inspections.
Inspection checklist for cabinet layout, blocking, fastening, level and plumb, fillers, panels, doors, drawers, hardware, appliance clearances, and finish quality.
Final inspection for countertop support, seams, overhangs, cutouts, sink and faucet openings, backsplash interfaces, sealants, surface damage, and care documentation.
Quality checklist for backsplash substrate preparation, tile layout, cuts, bond, outlets, grout, sealant, cleanup, and final acceptance.
General final inspection for refrigerators, ranges, ovens, washers, dryers, and similar appliances involving anchorage, utilities, clearances, venting, and startup.