Cabinet layout, blocking, utilities, and appliance openings match the plan
Critical itemCabinet locations and supports should match approved drawings and coordinate with walls, utilities, appliances, clearances, and future countertop loads.
Inspection checklist for cabinet layout, blocking, fastening, level and plumb, fillers, panels, doors, drawers, hardware, appliance clearances, and finish quality.
4 items to check
For a complete inspection, also consider:
Cabinet locations and supports should match approved drawings and coordinate with walls, utilities, appliances, clearances, and future countertop loads.
Cabinets, rails, cleats, anchors, shims, and fasteners should suit the wall construction and cabinet system and transfer loads into suitable support.
Hardware should be adjusted and secured so components remain aligned, open fully, close normally, and avoid adjacent walls, appliances, fixtures, and handles.
Visible and concealed finish components included in the scope should be securely installed, clean, and free of unresolved damage, sharp edges, open joints, or exposed unfinished material.
Use this checklist after cabinet boxes and visible trim are installed but before accepting the work or allowing later trades to hide attachment and alignment problems.
A homeowner closeout checklist for cabinets, countertops, plumbing, electrical, ventilation, appliances, tile, flooring, finishes, documentation, and final payment.
Final inspection for countertop support, seams, overhangs, cutouts, sink and faucet openings, backsplash interfaces, sealants, surface damage, and care documentation.