Every appliance, hood, panel, trim kit, accessory, serial, finish, and recall status matches approval and is undamaged
Critical itemDelivered products should match the locked schedule and be eligible for safe installation and warranty service.
A pre-final-payment kitchen appliance commissioning checklist for correct model and recall review, delivery damage, anchorage and anti-tip devices, electrical, gas, water, drainage and ventilation connections, shutoffs and service access, leveling and door adjustment, leak and fault testing, range-hood airflow and damper operation, refrigerator and icemaker setup, dishwasher fill and drain, oven and cooktop operation, smart-account ownership, protective-film removal, manuals, serials, warranties, maintenance, cleaning, owner training, punch list, and final acceptance.
6 items to check
Delivered products should match the locked schedule and be eligible for safe installation and warranty service.
Appliances should be stable, restrained where required, aligned, ventilated, and removable for service.
Connections should match nameplates, listings, adopted requirements, and product instructions without leakage, kinks, heat, abrasion, or inaccessible isolation.
Commissioning should reveal leaks, drainage failure, fault codes, abnormal heat, noise, vibration, odor, control errors, or unsafe operation.
The owner should control connected products and understand safe daily use and maintenance.
Final acceptance should preserve proof of compliant installation and unresolved corrections.
Use after appliances, hood, fixtures, cabinets, countertops, flooring, and utilities are complete but before final payment. Qualified trades must perform gas, electrical, combustion, refrigeration, pressure, and code-required tests; owner checks should remain within normal controls and visible conditions. Do not energize exposed work, open or test gas piping, pressure-test plumbing, operate incomplete appliances, enter unsafe framing or attics, or modify structure without authorization. Licensed trades and the AHJ control required tests and approvals.
General final inspection for refrigerators, ranges, ovens, washers, dryers, and similar appliances involving anchorage, utilities, clearances, venting, and startup.
A homeowner closeout checklist for cabinets, countertops, plumbing, electrical, ventilation, appliances, tile, flooring, finishes, documentation, and final payment.
A pre-rough-in kitchen layout checklist for finished-wall dimensions, cabinet and filler geometry, appliance models and openings, door and drawer collisions, work aisles and landing areas, sink and cooktop locations, ventilation capture, service access, accessibility goals, floor and countertop buildup, island position, structural support, utilities, and written approval before plumbing, wiring, gas, ductwork, blocking, or cabinet ordering locks in the plan.
A pre-cover kitchen plumbing checklist for sink and appliance locations, water and drainage sizing and routing, venting, cleanouts, slope, supports, shutoffs, refrigerator and dishwasher supplies, disposal and filtration space, island vent method, protection plates, fireblocking, insulation and freeze protection, pressure and drainage tests, inspection approval, and full route photographs before walls, floors, cabinets, or insulation hide the work.