Landscaping, grading, and drainage installation checklist

Final inspection checklist for grading, drainage paths, soil, planting, hardscape interfaces, utilities, erosion control, irrigation coordination, cleanup, and contractor closeout.

4 items to check

Inspection progress0 of 4
0%

Layout, utilities, permits, and protected areas match the approved plan

Critical item

Planting, excavation, walls, drainage, lighting, irrigation, and hardscape should respect approved plans, property limits, easements, utilities, trees, and permit conditions.

Finished grading and drainage direct water to approved locations

Critical item

Final grades, swales, drains, discharge points, soil transitions, and hardscape interfaces should follow the approved drainage design and avoid directing water into buildings, neighboring property, or unsafe areas.

Soil preparation, plants, staking, mulch, and establishment work are complete

Plant species, sizes, locations, soil preparation, root treatment, staking, mulch, watering, and establishment care should match the plan and horticultural instructions.

Hardscape interfaces, erosion control, cleanup, and records are complete

Edges, steps, walls, paths, drains, covers, temporary erosion controls, disturbed areas, and maintenance documentation should be safe, stable, clean, and consistent with approved work.

Use this checklist before accepting a landscaping installation. Drainage, stormwater, grading, planting, utility, retaining, and permit requirements are site-specific and should follow approved plans and local rules.

Reference standards

  • Approved plans, written scope, adopted state and local codes, permit conditions, authority having jurisdiction requirements, and manufacturer installation instructions
  • Approved landscape, grading, drainage, irrigation, utility, and erosion-control plans
  • Plant, soil, drainage product, geotextile, edging, hardscape, and irrigation instructions
  • Tools

  • Approved site and landscape plans
  • Camera, level, straightedge, hose or controlled water source where appropriate
  • Utility-marking, permit, inspection, plant, and warranty records