Reinforcing layout matches the approved structural design
Critical itemBar size, spacing, direction, layers, beam reinforcement, steps, benches, walls, floor, transitions, and locally reinforced zones should match the sealed or approved design.
Pre-shotcrete checklist for pool reinforcing layout, cover, supports, laps, penetrations, bond beam, embedded items, cleanliness, inspections, and documentation.
5 items to check
Bar size, spacing, direction, layers, beam reinforcement, steps, benches, walls, floor, transitions, and locally reinforced zones should match the sealed or approved design.
Concrete or shotcrete cover, bar support, stability, and separation from earth should follow the approved structural design and accepted supports for the exposure and placement method.
Lap locations and lengths, mechanical splices, bends, hooks, bar condition, and congestion should follow the structural details and placement requirements.
Embedded pool components and penetrations should be listed or approved, securely positioned, compatible with the shell system, and reinforced or detailed as required by the design.
Do not place shotcrete or gunite until required structural, electrical bonding, plumbing, and permit inspections are approved and corrections are documented.
Use this checklist after reinforcing steel and embedded items are substantially complete but before shotcrete or gunite. The approved structural design and required inspection govern bar size, spacing, laps, cover, and special details.
Preconstruction and excavation-stage checklist for residential pool location, permits, setbacks, utilities, access, elevations, soil conditions, drainage, and excavation geometry.
Pre-cover checklist for pool suction, return, spa, water feature, cleaner, drain, equipment, and pressure-test documentation before shell or deck work conceals piping.
Pre-cover field checklist for pool equipotential bonding, reinforcing steel, water bond, metal parts, equipment, conduits, boxes, inspections, and documentation.
Final pool construction checklist for shell finish interfaces, tile, coping, deck drainage, movement joints, equipment startup, barriers, gates, covers, alarms, and closeout records.