Water-heater type, capacity, location, support, and clearances match approval
Critical itemThe installed unit should suit the fuel, service, space, structural support, environmental exposure, and service access.
A pre-startup residential water-heater checklist for correct fuel and capacity, location and clearances, pan and drainage, thermal expansion, temperature and pressure relief discharge, venting or combustion air, electrical or gas connection, seismic or structural support, piping, shutoffs, permits, and leak readiness.
6 items to check
The installed unit should suit the fuel, service, space, structural support, environmental exposure, and service access.
Piping should be supported, identified, serviceable, and compatible with the selected materials and heater.
Relief discharge and expansion control should follow adopted requirements and product instructions without isolation or obstruction.
Leak or condensate management should protect finished areas and terminate appropriately.
Energy connections should match the nameplate, listing, and adopted fuel-gas or electrical requirements.
The heater should not be energized dry and should pass required operational and official checks.
Use after a tank or tankless water heater is installed but before normal owner use. This page verifies visible readiness; qualified trades must perform combustion, gas, electrical, and pressure testing. Do not enter contaminated, structurally unsafe, energized, confined, or oxygen-deficient areas; do not open pressurized systems or handle sewage. Use qualified plumbing, electrical, remediation, environmental, and structural professionals where applicable.
A focused heat-pump water-heater checklist for room volume and airflow, ducting where used, condensate, noise, structural support, electrical circuit, thermal expansion, relief discharge, controls, operating modes, commissioning, rebates, and owner handover before final acceptance.
A residential water-service checklist for main shutoff replacement, pressure-reducing valve orientation and setting, bypass and strainer conditions, pressure testing, thermal expansion control, meter and utility boundaries, supports, accessibility, labeling, leak checks, and owner emergency operation.
A pre-cover whole-house repipe checklist for approved material and sizing, fixture branches, manifolds and shutoffs, support and expansion, protection plates, fireblocking, insulation and freeze protection, pressure and leak testing, abandoned piping, grounding implications, permits, and comprehensive as-built photographs.
A pre-backfill sewer lateral checklist for permit and utility coordination, excavation safety, pipe material and diameter, bedding, slope and alignment, joints and transitions, cleanouts, building connection, testing or inspection, trench water, warning tape, restoration limits, and photographic evidence before the repair disappears underground.