The video clearly identifies the property, access point, direction, date, and inspected line
Critical itemMedia should be traceable to the exact repaired segment.
A post-repair sewer camera checklist for correct line and access point, continuous video, footage and distance reference, pipe condition, joints and transitions, slope indicators, debris and roots, branch connections, repair limits, flow observation, written findings, and retained media before final acceptance.
6 items to check
Media should be traceable to the exact repaired segment.
The inspection should not skip questionable areas and should preserve usable footage.
The report should distinguish repaired, existing, and unresolved conditions.
Connections should remain open, correctly oriented, and serviceable.
Construction debris and residual blockage should not remain after repair.
The owner should receive permanent evidence and clear remaining limitations.
Use after sewer repair, lining, cleaning, or replacement and before final payment. A camera image is evidence, not a substitute for engineering or authority acceptance when those are required. Do not enter contaminated, structurally unsafe, energized, confined, or oxygen-deficient areas; do not open pressurized systems or handle sewage. Use qualified plumbing, electrical, remediation, environmental, and structural professionals where applicable.
A pre-backfill sewer lateral checklist for permit and utility coordination, excavation safety, pipe material and diameter, bedding, slope and alignment, joints and transitions, cleanouts, building connection, testing or inspection, trench water, warning tape, restoration limits, and photographic evidence before the repair disappears underground.
A final-payment checklist for completed scope and punch list, final inspections and occupancy approvals, manuals and warranties, as-built records, final invoice and credits, state-specific lien waivers, payment evidence, and warranty contacts.
A pre-startup residential water-heater checklist for correct fuel and capacity, location and clearances, pan and drainage, thermal expansion, temperature and pressure relief discharge, venting or combustion air, electrical or gas connection, seismic or structural support, piping, shutoffs, permits, and leak readiness.
A focused heat-pump water-heater checklist for room volume and airflow, ducting where used, condensate, noise, structural support, electrical circuit, thermal expansion, relief discharge, controls, operating modes, commissioning, rebates, and owner handover before final acceptance.