The inspector has current plans, revisions, prior reports, permit status, and access to all inspectable areas
Critical itemThe review should use the actual approved project baseline and identify areas that were inaccessible or already concealed.
An independent pre-drywall new-home inspection checklist for document readiness, structural and framing follow-up, rough-in coordination, exterior water management, insulation release, fire and life safety, permit status, deficiency prioritization, correction evidence, and written authorization before walls and ceilings are closed.
6 items to check
The review should use the actual approved project baseline and identify areas that were inaccessible or already concealed.
Visible structural conditions and documented repairs should align with approved design and required inspections.
Visible rough-ins should be supported, protected, accessible, tested, and located consistently with plans and selected equipment.
Water-management layers visible at this stage should direct water outward and integrate with adjacent systems.
Required life-safety and thermal assemblies should be complete and not compromised by late trade work.
The builder should receive a location-specific, prioritized list and drywall should not cover unresolved critical or inspection-dependent conditions.
Use shortly before drywall when framing, rough-ins, exterior dry-in, and insulation can still be observed. An independent inspector supplements but does not replace the AHJ, engineer, special inspector, licensed trades, builder quality control, appraisal, lender review, or certification-program inspections. Do not enter unsupported excavations, walk incomplete framing or roofs, open energized equipment, operate pressurized systems without authorization, or interfere with required inspections. Use qualified inspectors and licensed trades for inaccessible, structural, electrical, gas, mechanical, environmental, or life-safety conditions.
A pre-drywall new-home thermal-enclosure checklist for air-barrier continuity, insulation type and R-value, full cavity contact, attic and roof details, rim joists, penetrations, baffles, shafts, tubs and fireplaces, moisture condition, trade protection, required inspections, and photographic evidence before finishes conceal the work.
A pre-closing new-home walkthrough checklist for contract and selection conformity, permits and occupancy status, exterior drainage and envelope, room finishes, plumbing, electrical, HVAC, appliances, safety features, functional testing, manuals, warranties, keys, utilities, open corrections, and written closing decisions before ownership and payment leverage changes.
A pre-contract new-home checklist for plan identity, site and model options, written specifications, allowances, substitutions, exclusions, schedule, inspections, change control, payment milestones, warranty documents, and unresolved assumptions before signing or depositing funds.
A pre-excavation new-home checklist for survey control, setbacks, easements, finished-floor elevation, drainage concept, utility conflicts, access, erosion control, tree and property protection, soil information, excavation limits, and documentation before irreversible site work begins.