New-home 11-month builder warranty inspection checklist

A comprehensive pre-deadline new-home warranty inspection checklist for reviewing contract and warranty dates, prior repairs, structure and movement, roof and exterior water management, foundation and drainage, plumbing, electrical, HVAC and ventilation, insulation and moisture, interiors and safety, seasonal limitations, specialist referrals, formal written notice, correction verification, and preservation of unresolved claims before common first-year milestones expire.

6 items to check

Inspection progress0 of 6
0%

Warranty documents, legal or contractual deadlines, exclusions, prior notices, and repair history are organized first

Critical item

The inspection and notice plan should use the actual documents and preserve every relevant date and unresolved condition.

Roof, attic, cladding, openings, flashing, decks, foundation, grading, drainage, and exterior systems are reviewed after seasonal exposure

Critical item

The exterior and site should manage water, weather, loads, and movement without active leakage, unsafe condition, or unresolved installation defect.

Plumbing, electrical, gas, HVAC, ventilation, appliances, safety devices, and controls are functionally reviewed

Critical item

Systems should operate safely and consistently with commissioning, listing, design, and owner documentation.

Structural movement indicators, floors, walls, ceilings, stairs, guards, doors, windows, cabinets, tile, and finishes are mapped

Critical item

Observed movement and defects should be measured, located, and referred appropriately rather than dismissed or overstated.

Inaccessible, structural, environmental, roof, sewer, HVAC, electrical, plumbing, pool, well, or septic concerns receive timely specialist review

Critical item

A general inspection should identify when qualified design, trade testing, environmental assessment, camera work, laboratory sampling, or seasonal follow-up is needed.

Formal warranty notice, builder response, correction scope, access, retesting, and unresolved rights are tracked to verified completion

Critical item

Each item should be submitted and closed according to controlling documents without waiving unresolved conditions through informal status updates.

Use early enough before the applicable builder or component warranty milestone to inspect, obtain specialist input, and deliver notice through the required channel. โ€œ11-monthโ€ is a planning convention, not a universal legal deadline; actual rights, exclusions, statutes, and notice dates vary by contract and jurisdiction. Do not enter unsupported excavations, walk incomplete framing or roofs, open energized equipment, operate pressurized systems without authorization, or interfere with required inspections. Use qualified inspectors and licensed trades for inaccessible, structural, electrical, gas, mechanical, environmental, or life-safety conditions.

Reference standards

  • Approved plans and specifications, signed purchase or construction agreement, selections and allowances, adopted state and local codes, permit and inspection conditions, authority having jurisdiction requirements, builder warranty documents, utility requirements, qualified design, and exact product manufacturer instructions
  • Purchase and warranty documents, closing and 30-day reports, service requests, correction records, seasonal commissioning limits, manufacturer warranties, and applicable state consumer or new-home warranty requirements
  • Tools

  • Current plans, specifications, selections, contract, change orders, permit records, inspection approvals, and warranty documents
  • Camera, flashlight, tape measure, level, outlet or fixture test tools used only where owner-safe, and dated location-based photographs
  • Written deficiency log with location, controlling document, responsible party, correction evidence, and release decision
  • Related Checklists

    New-home 30-day post-occupancy review checklist

    An early-occupancy new-home checklist for documenting leaks, drainage, HVAC comfort, ventilation, controls, doors and windows, finishes, appliances, safety devices, settlement-related observations, exterior water behavior, utility or smart-account ownership, maintenance setup, builder notice requirements, and urgent versus routine warranty decisions after normal use reveals conditions missed at closing.

    Builder punch-list correction verification checklist

    A new-home builder correction checklist for matching each promised repair to its original deficiency, confirming access and protection, reviewing hidden or specialist work, retesting affected systems, checking collateral damage and finish quality, obtaining permit or manufacturer evidence, closing only verified items, and preserving unresolved obligations after closing.

    New-home plans, specifications, and allowances before signing checklist

    A pre-contract new-home checklist for plan identity, site and model options, written specifications, allowances, substitutions, exclusions, schedule, inspections, change control, payment milestones, warranty documents, and unresolved assumptions before signing or depositing funds.

    New-home site layout and excavation readiness checklist

    A pre-excavation new-home checklist for survey control, setbacks, easements, finished-floor elevation, drainage concept, utility conflicts, access, erosion control, tree and property protection, soil information, excavation limits, and documentation before irreversible site work begins.