Radon mitigation post-installation retest and handover checklist

A radon mitigation closeout checklist for confirming continuous fan and warning-device operation, completing a valid post-mitigation radon test under the applicable timing and placement protocol, evaluating results against the agreed target without claiming zero risk, correcting inadequate performance, checking noise, vibration, condensate and building interactions, delivering system drawings, diagnostics, warranties and maintenance instructions, and planning future retesting before final payment.

6 items to check

Inspection progress0 of 6
0%

Fan, warning device, pressure indicator and electrical supply operate continuously and visibly

Critical item

The owner should be able to detect loss of system operation.

Post-mitigation testing uses a valid device, location, timing and operating conditions

Critical item

Acceptance should rely on a representative test after system stabilization.

Results are compared with the contract target and EPA guidance without describing any result as zero risk

Critical item

Failed or marginal performance should trigger diagnosis rather than unsupported reassurance.

Inadequate performance, leaks, noise, vibration, condensate or combustion concerns are corrected and retested

Critical item

The contractor should complete the agreed performance response.

The owner receives route drawings, fan data, diagnostics, test results, warranties and maintenance instructions

Critical item

Future owners and service technicians should understand the system.

A future retesting and inspection plan is documented, including after major building or HVAC changes

Critical item

System performance should be checked over time.

Use after the system has operated for the required stabilization period and before final acceptance. EPA recommends maintaining warning devices and periodic retesting; state or professional standards may set additional timing and documentation. Stop work when suspect hazardous material, uncontrolled dust, sewage, extensive mold, unsafe structure, damaged containment, exposed energized work or an unplanned release is found. Homeowners should not collect asbestos samples, disturb suspect materials, enter regulated containments or perform specialist clearance testing unless properly qualified and permitted.

Reference standards

  • Current EPA lead, asbestos, mold and radon guidance; applicable federal, state, tribal and local environmental, occupational, licensing, disposal, permit and notification requirements; the signed remediation scope; laboratory and field reports; building and mechanical requirements; and exact containment, filtration, cleaning, disposal, mitigation-system and product instructions
  • EPA Consumer’s Guide to Radon Reduction and current EPA maintenance and retesting guidance
  • Tools

  • Building-age and renovation records, environmental reports, laboratory results, contractor credentials, scope, permits, notifications, waste records, photographs and occupant-protection plan
  • Camera, flashlight, tape measure and owner-safe observation tools; specialist sampling, pressure monitoring, moisture instruments, clearance testing and radon devices where required
  • Qualified lead, asbestos, mold, industrial-hygiene, radon, mechanical, electrical, laboratory and medical professionals as appropriate
  • Related Checklists

    Radon mitigation installation before startup checklist

    A pre-startup radon mitigation installation checklist for verifying suction points and sealed interfaces, crawlspace membrane or sump details, pipe size and supports, fan orientation and location, exterior and roof penetrations, condensate and freeze considerations, discharge clearances, electrical disconnect and labeling, warning device, fire and weather restoration, photographs, diagnostic records and correction of leaks or unsafe conditions before the fan enters continuous service.

    Radon mitigation proposal before installation checklist

    A pre-contract radon mitigation checklist for confirming valid elevated test results, selecting a qualified professional under state and private credentialing requirements, documenting foundation and crawlspace conditions, choosing a pressure-field and vent strategy, locating fan, piping, discharge, electrical supply, warning device and sealing work, coordinating roof and fire assemblies, defining post-installation testing and owner records, and comparing bids before penetrations or equipment installation begins.

    Pre-1978 lead renovation scope before work checklist

    A pre-work checklist for determining whether renovation in pre-1978 housing or a child-occupied facility may disturb painted surfaces, verifying the responsible firms and certified renovator, identifying state-authorized program differences, documenting testing or applicable determinations, defining occupant protection and exclusions, and preventing demolition, sanding, cutting or paint disturbance before the lead-safe scope is settled.

    Lead containment before paint disturbance checklist

    A pre-disturbance lead containment checklist for interior and exterior work-zone boundaries, floor and ground protection, access control, HVAC and opening isolation, warning signs, material and debris routes, occupant separation, tool and waste staging, weather considerations, adjacent-property protection, photographs and written release before scraping, sanding, cutting, drilling, demolition or other paint disturbance begins.