Fan, warning device, pressure indicator and electrical supply operate continuously and visibly
Critical itemThe owner should be able to detect loss of system operation.
A radon mitigation closeout checklist for confirming continuous fan and warning-device operation, completing a valid post-mitigation radon test under the applicable timing and placement protocol, evaluating results against the agreed target without claiming zero risk, correcting inadequate performance, checking noise, vibration, condensate and building interactions, delivering system drawings, diagnostics, warranties and maintenance instructions, and planning future retesting before final payment.
6 items to check
The owner should be able to detect loss of system operation.
Acceptance should rely on a representative test after system stabilization.
Failed or marginal performance should trigger diagnosis rather than unsupported reassurance.
The contractor should complete the agreed performance response.
Future owners and service technicians should understand the system.
System performance should be checked over time.
Use after the system has operated for the required stabilization period and before final acceptance. EPA recommends maintaining warning devices and periodic retesting; state or professional standards may set additional timing and documentation. Stop work when suspect hazardous material, uncontrolled dust, sewage, extensive mold, unsafe structure, damaged containment, exposed energized work or an unplanned release is found. Homeowners should not collect asbestos samples, disturb suspect materials, enter regulated containments or perform specialist clearance testing unless properly qualified and permitted.
A pre-startup radon mitigation installation checklist for verifying suction points and sealed interfaces, crawlspace membrane or sump details, pipe size and supports, fan orientation and location, exterior and roof penetrations, condensate and freeze considerations, discharge clearances, electrical disconnect and labeling, warning device, fire and weather restoration, photographs, diagnostic records and correction of leaks or unsafe conditions before the fan enters continuous service.
A pre-contract radon mitigation checklist for confirming valid elevated test results, selecting a qualified professional under state and private credentialing requirements, documenting foundation and crawlspace conditions, choosing a pressure-field and vent strategy, locating fan, piping, discharge, electrical supply, warning device and sealing work, coordinating roof and fire assemblies, defining post-installation testing and owner records, and comparing bids before penetrations or equipment installation begins.
A pre-work checklist for determining whether renovation in pre-1978 housing or a child-occupied facility may disturb painted surfaces, verifying the responsible firms and certified renovator, identifying state-authorized program differences, documenting testing or applicable determinations, defining occupant protection and exclusions, and preventing demolition, sanding, cutting or paint disturbance before the lead-safe scope is settled.
A pre-disturbance lead containment checklist for interior and exterior work-zone boundaries, floor and ground protection, access control, HVAC and opening isolation, warning signs, material and debris routes, occupant separation, tool and waste staging, weather considerations, adjacent-property protection, photographs and written release before scraping, sanding, cutting, drilling, demolition or other paint disturbance begins.