Pre-1978 lead renovation scope before work checklist

A pre-work checklist for determining whether renovation in pre-1978 housing or a child-occupied facility may disturb painted surfaces, verifying the responsible firms and certified renovator, identifying state-authorized program differences, documenting testing or applicable determinations, defining occupant protection and exclusions, and preventing demolition, sanding, cutting or paint disturbance before the lead-safe scope is settled.

6 items to check

Inspection progress0 of 6
0%

Building age, occupancy and exact painted components to be disturbed are documented

Critical item

The applicability review should use actual construction and work scope rather than assumptions from appearance.

The controlling EPA or authorized state lead program and any HUD or local requirements are identified

Critical item

Jurisdiction-specific requirements should be resolved before bids and scheduling.

Every paid firm that will disturb paint has appropriate firm certification and a responsible certified renovator

Critical item

Covered firms and individuals should hold current credentials applicable to the work and jurisdiction.

Any lead-free determination or testing basis is made by an authorized person using an accepted method

Critical item

Visual appearance, paint age guesses and homeowner test claims should not substitute for an applicable documented determination.

Pre-renovation education, occupant communication and protection for children, pregnant occupants, pets and belongings are planned

Critical item

Required information and a workable occupancy plan should precede disturbance.

The written scope names lead-safe practices, containment, cleaning, verification, waste handling, records and change control

Critical item

Lead controls should be enforceable project requirements rather than an informal promise.

Use before contracting or starting paint-disturbing work in older housing. EPA RRP requirements generally apply to paid renovation in covered pre-1978 housing and child-occupied facilities, while authorized state programs or additional HUD and local rules may differ. Stop work when suspect hazardous material, uncontrolled dust, sewage, extensive mold, unsafe structure, damaged containment, exposed energized work or an unplanned release is found. Homeowners should not collect asbestos samples, disturb suspect materials, enter regulated containments or perform specialist clearance testing unless properly qualified and permitted.

Reference standards

  • Current EPA lead, asbestos, mold and radon guidance; applicable federal, state, tribal and local environmental, occupational, licensing, disposal, permit and notification requirements; the signed remediation scope; laboratory and field reports; building and mechanical requirements; and exact containment, filtration, cleaning, disposal, mitigation-system and product instructions
  • EPA Renovation, Repair and Painting Rule, Renovate Right materials and March 2026 lead-safe renovation guidance
  • Tools

  • Building-age and renovation records, environmental reports, laboratory results, contractor credentials, scope, permits, notifications, waste records, photographs and occupant-protection plan
  • Camera, flashlight, tape measure and owner-safe observation tools; specialist sampling, pressure monitoring, moisture instruments, clearance testing and radon devices where required
  • Qualified lead, asbestos, mold, industrial-hygiene, radon, mechanical, electrical, laboratory and medical professionals as appropriate
  • Related Checklists

    Lead containment before paint disturbance checklist

    A pre-disturbance lead containment checklist for interior and exterior work-zone boundaries, floor and ground protection, access control, HVAC and opening isolation, warning signs, material and debris routes, occupant separation, tool and waste staging, weather considerations, adjacent-property protection, photographs and written release before scraping, sanding, cutting, drilling, demolition or other paint disturbance begins.

    Lead cleaning verification and project records checklist

    A lead-project closeout checklist for staged debris removal, detailed HEPA and wet cleaning, certified-renovator visual inspection and cleaning verification where applicable, any required clearance testing, containment removal sequence, exterior chip recovery, occupant re-entry, waste and training records, photographs, owner delivery and unresolved-condition documentation before the area returns to normal use or receives final payment.

    Lead work practices during renovation checklist

    An active-work lead checklist for maintaining containment, controlling dust and debris, avoiding prohibited or uncontrolled high-dust methods, using required tool attachments and practices, supervising workers, protecting occupants and adjacent areas, responding to containment failures, cleaning as work progresses, documenting daily conditions and controlling scope changes until final cleaning can begin.

    Suspected asbestos before demolition checklist

    A stop-before-disturbance asbestos checklist for identifying suspect floor and ceiling materials, pipe and duct insulation, cement products, mastics, roofing, siding, textured coatings and vermiculite; documenting condition and planned disturbance; selecting an accredited inspector and qualified laboratory; checking state and local renovation or demolition rules; isolating the area and preventing sampling, drilling, sanding, demolition or disposal until written results and a compliant path are available.