Suction points, sumps, drains and pressure zones match the approved diagnostic design
Critical itemThe installed extraction path should serve the intended foundation zones.
A pre-startup radon mitigation installation checklist for verifying suction points and sealed interfaces, crawlspace membrane or sump details, pipe size and supports, fan orientation and location, exterior and roof penetrations, condensate and freeze considerations, discharge clearances, electrical disconnect and labeling, warning device, fire and weather restoration, photographs, diagnostic records and correction of leaks or unsafe conditions before the fan enters continuous service.
6 items to check
The installed extraction path should serve the intended foundation zones.
Membrane work should support pressure control and remain inspectable.
The system should be airtight on the suction side and mechanically stable.
Exhaust should discharge to an acceptable outdoor location under controlling requirements.
Continuous equipment should have safe power and visible failure indication.
The owner and tester should know exactly what was installed before operation changes conditions.
Use after physical installation but before normal continuous operation and before concealment of any part of the system. Stop work when suspect hazardous material, uncontrolled dust, sewage, extensive mold, unsafe structure, damaged containment, exposed energized work or an unplanned release is found. Homeowners should not collect asbestos samples, disturb suspect materials, enter regulated containments or perform specialist clearance testing unless properly qualified and permitted.
A pre-contract radon mitigation checklist for confirming valid elevated test results, selecting a qualified professional under state and private credentialing requirements, documenting foundation and crawlspace conditions, choosing a pressure-field and vent strategy, locating fan, piping, discharge, electrical supply, warning device and sealing work, coordinating roof and fire assemblies, defining post-installation testing and owner records, and comparing bids before penetrations or equipment installation begins.
A radon mitigation closeout checklist for confirming continuous fan and warning-device operation, completing a valid post-mitigation radon test under the applicable timing and placement protocol, evaluating results against the agreed target without claiming zero risk, correcting inadequate performance, checking noise, vibration, condensate and building interactions, delivering system drawings, diagnostics, warranties and maintenance instructions, and planning future retesting before final payment.
A pre-work checklist for determining whether renovation in pre-1978 housing or a child-occupied facility may disturb painted surfaces, verifying the responsible firms and certified renovator, identifying state-authorized program differences, documenting testing or applicable determinations, defining occupant protection and exclusions, and preventing demolition, sanding, cutting or paint disturbance before the lead-safe scope is settled.
A pre-disturbance lead containment checklist for interior and exterior work-zone boundaries, floor and ground protection, access control, HVAC and opening isolation, warning signs, material and debris routes, occupant separation, tool and waste staging, weather considerations, adjacent-property protection, photographs and written release before scraping, sanding, cutting, drilling, demolition or other paint disturbance begins.