Waterproofing inspections
Focused checks before tile, backer cover-up, cladding, or finish work hides wet-area waterproofing details.
3 checklists in category
Shower pan flood test before tile
A US job-site check for verifying a shower receptor or pan liner flood test before tile, setting bed, curb finish, or other cover-up hides the waterproofing.
Open checklist
Shower drain membrane connection before tile
A 10-25 minute check of the waterproofing membrane connection at a clamping drain or bonding flange drain before tile, mortar, or deck mud hides the detail.
Open checklist
Shower curb waterproofing before tile
A 10-25 minute check of shower curb waterproofing before tile, backer, lath, mortar, or trim hides the leak-prone details.
Open checklist