Built dimensions, structure and changes reconcile to approved plans
Critical itemUnapproved field changes should be resolved before closeout.
A whole-project deck and porch closeout checklist for reconciling approved plans and changes, confirming footing, framing, electrical and final inspections, reviewing structural and flashing photographs, checking drainage, house interfaces, decking, stairs, guards, lighting and receptacles, identifying settlement, movement, sharp edges and trip hazards, verifying cleanup and grading, collecting product and treatment records, warranties and maintenance instructions, documenting load and use limitations and holding final payment until punch-list and permit closure are complete.
6 items to check
Unapproved field changes should be resolved before closeout.
A final inspection does not necessarily recreate concealed hold points.
Finished work should not direct water into the house or foundations.
The completed structure should be evaluated as a route and occupied space.
Construction impacts should not create drainage or safety problems.
Owners need inspection and care information.
Use before final payment and again after an initial period of use. Do not enter unsupported excavations, work below suspended framing, climb incomplete structures, load unbraced decks, remove shoring or test guards by hazardous body loading. Structural changes, ledgers, stairs, guards, electrical work and elevated porches require appropriate design, permits and qualified construction.
A final guard and handrail checklist for verifying where guards and handrails are required under the approved project, finished heights and continuity, graspable profiles and wall clearance, returns and extensions where applicable, post and rail attachment to documented framing, infill opening and climbability conditions, stair transitions, gate and screen interactions, corrosion and finish quality, sharp edges, movement and damage, lighting, maintenance access, permit final and safe professional or owner-level functional checks before final payment.
A pre-contract checklist for defining deck or porch size, height, loads, roof or enclosure, stairs and guards; confirming property setbacks, easements, utilities and septic constraints; determining attached versus freestanding support; documenting existing house framing and cladding; obtaining approved structural and water-management details; specifying wood species, treatment, corrosion environment, connectors and fasteners; assigning permits, inspections, demolition, hidden-damage allowances, electrical and finish work; and comparing equivalent bids before signing.
A pre-pour deck footing checklist for verifying approved layout and setbacks, utility clearance, excavation safety, undisturbed bearing or engineered preparation, footing diameter and shape, depth for frost and soil conditions, bottom elevation, groundwater and loose material, reinforcement where specified, forms, post-base or anchor layout, concrete access and weather plan, required inspection release and dimensioned photographs before concrete permanently conceals the excavation.
A post and column checklist for confirming cured and undamaged footings or piers, correct post-base model, anchor embedment and corrosion compatibility, required standoff above concrete or grade, post species, treatment, grade, size and end treatment, plumb and bearing, caps and beam connection, temporary bracing, splice prohibition or approved splice detail, protection from water and soil, porch-column enclosure ventilation and complete photographs before beams, skirting or finishes reduce access.