Footing or pier is located, cured, intact and at the required elevation
Critical itemPosts should start from an accepted foundation.
A post and column checklist for confirming cured and undamaged footings or piers, correct post-base model, anchor embedment and corrosion compatibility, required standoff above concrete or grade, post species, treatment, grade, size and end treatment, plumb and bearing, caps and beam connection, temporary bracing, splice prohibition or approved splice detail, protection from water and soil, porch-column enclosure ventilation and complete photographs before beams, skirting or finishes reduce access.
6 items to check
Posts should start from an accepted foundation.
Connector substitutions can change capacity and durability.
End grain and untreated surfaces should not remain wet.
Cracked, notched or undersized posts can interrupt the load path.
Beams should bear directly or use an approved connector rather than side bolts alone.
Tall posts and incomplete frames need stability.
Use after foundations are ready and before posts carry permanent framing loads. Do not enter unsupported excavations, work below suspended framing, climb incomplete structures, load unbraced decks, remove shoring or test guards by hazardous body loading. Structural changes, ledgers, stairs, guards, electrical work and elevated porches require appropriate design, permits and qualified construction.
A pre-pour deck footing checklist for verifying approved layout and setbacks, utility clearance, excavation safety, undisturbed bearing or engineered preparation, footing diameter and shape, depth for frost and soil conditions, bottom elevation, groundwater and loose material, reinforcement where specified, forms, post-base or anchor layout, concrete access and weather plan, required inspection release and dimensioned photographs before concrete permanently conceals the excavation.
A pre-decking framing checklist for verifying beam size, plies, splices and bearing over posts; joist size, spacing, span, cantilever and crown; approved hangers, caps, clips and fasteners; rim and blocking; stair and guard-post reinforcement; concentrated loads and openings; lateral and diagonal bracing; field holes and notches; treated cut ends; drainage and ventilation around framing; alignment, level and temporary stability; and framing inspection photographs before deck boards or porch flooring conceal the structure.
A pre-contract checklist for defining deck or porch size, height, loads, roof or enclosure, stairs and guards; confirming property setbacks, easements, utilities and septic constraints; determining attached versus freestanding support; documenting existing house framing and cladding; obtaining approved structural and water-management details; specifying wood species, treatment, corrosion environment, connectors and fasteners; assigning permits, inspections, demolition, hidden-damage allowances, electrical and finish work; and comparing equivalent bids before signing.
A pre-concealment deck ledger checklist for confirming the existing house rim or structural substrate is sound and accessible, prohibiting attachment through unsupported masonry or stone veneer and other unsuitable conditions unless specifically engineered, verifying ledger size and treated material, removing incompatible cladding only as designed, installing approved bolts or structural screws at the required spacing and stagger, preserving edge and end distances, avoiding utilities, coordinating lateral-load connections and photographing every fastener and interior condition before insulation, ceiling, siding or decking hides the attachment.