Servicer identity, endorsement, account, loss-draft packet, contacts, and submission channel are verified
Critical itemClaim checks and sensitive documents should be handled through confirmed lender procedures.
A claim-funds control checklist for insurance-check endorsement, mortgage-servicer loss-draft packet, contractor documents, permits, owner contribution, draw stages, inspections, stored materials, progress verification, conditional and unconditional lien waivers, subcontractor and supplier notices, depreciation recovery, change orders, final inspection, remaining balance, and fraud-resistant payment instructions.
6 items to check
Claim checks and sensitive documents should be handled through confirmed lender procedures.
The repair plan should identify any funding gap before obligations are signed.
Document approval should precede draw delay and mobilization conflict.
Release should follow objective milestones and lender inspection requirements.
State-specific forms, claimant lists, amounts, through-dates, and timing should be correct.
The last release should leave enough leverage and documentation to close the project.
Use when an insurance payment names the mortgage lender or servicer or when repairs are paid in stages. CFPB notes that servicers commonly release part of the settlement before work, more as work progresses, and the remainder after completion and inspection. Mechanics-lien rules and waiver forms are state-specific. Do not climb storm-damaged roofs, enter unstable or flooded structures, touch downed electrical conductors, operate fuel-powered generators indoors, or begin hazardous cleanup without qualified direction. Emergency safety and temporary weather protection come before detailed inspection.
A homeowner insurance payment checklist for identifying actual cash value and replacement cost treatment, deductible, nonrecoverable and recoverable depreciation, policy limits, endorsements, itemized withheld amounts, repair deadlines, proof-of-completion requirements, mortgage-servicer endorsement, staged contractor payments, supplements, invoices, and final depreciation requests without confusing claim proceeds with contract price.
A payment-approval checklist for confirming the milestone definition, installed work, inspections, correction status, stored materials, approved change orders, payment math, conditional lien waivers, and remaining balance before releasing funds.
A first-response storm documentation checklist for life safety, insurer notice, date and event evidence, exterior and interior overview photographs, roof and envelope observations from safe locations, water entry, damaged contents, emergency services, temporary protection boundaries, pre-existing conditions, mitigation receipts, and a communication log before cleanup or temporary repairs alter the evidence.
A pre-authorization emergency mitigation checklist for contractor identity and pricing, exact tarp or board-up area, roof and wall attachment method, interior water extraction and material removal limits, temporary power and generator safety, contents protection, drying equipment, daily monitoring, insurer communication, change authorization, evidence preservation, duration, maintenance, and transition to permanent repair.