Storm and insurance restoration
US claim-control checklists for documenting hail, wind, water, and storm damage, ordering emergency protection, comparing contractor and adjuster scopes, reviewing ACV and RCV payments, supplements and code upgrades, mortgage-servicer draws, staged lien releases, final restoration inspection, and claim closeout.
7 checklists in category
Filter this category by project stage →Storm damage documentation before temporary repair checklist
A first-response storm documentation checklist for life safety, insurer notice, date and event evidence, exterior and interior overview photographs, roof and envelope observations from safe locations, water entry, damaged contents, emergency services, temporary protection boundaries, pre-existing conditions, mitigation receipts, and a communication log before cleanup or temporary repairs alter the evidence.
Emergency tarp and mitigation scope review checklist
A pre-authorization emergency mitigation checklist for contractor identity and pricing, exact tarp or board-up area, roof and wall attachment method, interior water extraction and material removal limits, temporary power and generator safety, contents protection, drying equipment, daily monitoring, insurer communication, change authorization, evidence preservation, duration, maintenance, and transition to permanent repair.
Contractor estimate versus insurance scope checklist
An apples-to-apples insurance restoration checklist for matching damaged areas, quantities, materials, removal and replacement, access and protection, code and permit work, taxes and overhead, depreciation, prior damage, emergency mitigation, contents, temporary repairs, exclusions, contractor supplements, and owner-responsibility items before signing a restoration contract.
ACV, RCV, and recoverable depreciation review checklist
A homeowner insurance payment checklist for identifying actual cash value and replacement cost treatment, deductible, nonrecoverable and recoverable depreciation, policy limits, endorsements, itemized withheld amounts, repair deadlines, proof-of-completion requirements, mortgage-servicer endorsement, staged contractor payments, supplements, invoices, and final depreciation requests without confusing claim proceeds with contract price.
Insurance supplement and code-upgrade review checklist
A before-authorization supplement checklist for newly discovered damage, measurement or quantity corrections, required access and related work, permit and adopted-code upgrades, ordinance-or-law coverage, manufacturer requirements, engineering, photographs, inspection findings, contractor pricing, schedule impact, insurer approval, owner responsibility, and written change orders before additional restoration work proceeds.
Mortgage-servicer draw and lien-release control checklist
A claim-funds control checklist for insurance-check endorsement, mortgage-servicer loss-draft packet, contractor documents, permits, owner contribution, draw stages, inspections, stored materials, progress verification, conditional and unconditional lien waivers, subcontractor and supplier notices, depreciation recovery, change orders, final inspection, remaining balance, and fraud-resistant payment instructions.
Storm restoration final inspection and insurance claim closeout checklist
A final storm-restoration checklist for completed contract and approved supplements, technical roof and envelope acceptance, interior drying and finishes, permits and inspections, utilities and equipment, debris and property restoration, final invoice and depreciation package, mortgage-servicer release, warranties, product and color records, conditional and final lien waivers, contents and temporary-living claims, unresolved coverage items, paid receipts, and archived claim evidence before final payment and claim closure.