Skip to content

Private wellhead sanitary protection checklist

A wellhead checklist for confirming the well location and construction record, casing height and integrity, approved sanitary cap or seal, screened vent orientation, protected electrical conduit and pitless-adapter area, positive drainage away from the casing, separation from septic, fuel, animals, fertilizers, floodwater and vehicle hazards, freeze protection without creating contamination paths, secure access, abandoned-well control, disinfection after opening or repair and dimensioned photographs before landscaping, grading or structures reduce inspection access.

6 items to check

Inspection progress0 of 6
0%

Well identity, depth, casing and completion record match the physical well

Critical item

Protection details depend on construction type.

Cap or seal is intact, secure, vermin-resistant and compatible with cables and piping

Critical item

Improvised openings can admit contaminants.

Casing is sound and extends to the required protected elevation

Critical item

Cracks and low casing invite surface entry.

Ground slopes away and runoff, roof water, irrigation and flooding are controlled

Critical item

Water should not pond around the well.

Nearby septic, chemicals, animals, fuel and waste sources meet applicable separation and risk controls

Critical item

Site use changes can create new contamination risk.

Repairs, opening, disinfection, sampling and landscaping leave secure documented access

Critical item

Service should not compromise sanitary protection.

Use after well construction or repair and during property maintenance. Do not open or disinfect a well without qualified procedures. Do not enter septic tanks, wells, pits or excavations; lean over open tanks; breathe confined-space gases; touch exposed wiring; operate pumps dry; drink unverified water; add chemicals to mask a failing system; or drive heavy equipment over tanks and drainfields. Openings require secure barriers and qualified control. Private-well and septic rules vary substantially by jurisdiction.

Reference standards

  • Applicable state, tribal and local onsite-wastewater, private-well, plumbing, health, environmental, electrical and building requirements; local health department and water or sewer authority records; approved site evaluation, design and permits; property survey and easements; qualified inspection, drilling, laboratory and service reports; and exact tank, pump, alarm, treatment, well, pressure-system and disinfection instructions
  • State well-construction requirements, EPA and CDC sanitary well guidance and exact cap or pitless equipment instructions
  • Tools

  • Property survey, septic and well permits, as-builts, pumping and service records, water results, utility maps, disclosures, manuals, receipts and photographs
  • Camera, tape, flashlight and owner-safe observation tools; qualified probing, locating, pumping, camera, hydraulic, electrical, yield, pressure and laboratory testing where permitted
  • Qualified onsite-wastewater professional, septic designer, installer, pumper, plumber, electrician, well contractor, pump professional, certified laboratory and health department as applicable
  • Related Checklists

    Private well inspection before home purchase checklist

    A buyer private-well checklist for obtaining well log, construction and permit records, identifying well type, depth, casing and age, locating property and shared-water rights, measuring setbacks from septic and contamination sources, inspecting accessible wellhead, cap, casing, vent and drainage, reviewing pump, pressure tank, controls and treatment, checking yield and recovery records, collecting transaction water samples through a qualified protocol, evaluating abandoned wells and cross-connections, documenting seasonal and drought limitations and obtaining repair, treatment or further evaluation before closing.

    Private well pump and pressure tank startup checklist

    A pre-use private-well pumping-system checklist for confirming pump model, depth, cable and drop-pipe records, safe electrical disconnect and control box, grounding and conduit, check valves and pitless connection, pressure tank type, size and precharge, pressure-switch settings and gauge, relief and drain provisions where required, piping support and freeze protection, treatment and softener connections, leak and cycling tests, flow and current observations by qualified professionals, emergency shutdown, generator compatibility, commissioning sheet and owner instruction before routine occupancy.

    Septic inspection before home purchase checklist

    A buyer checklist for confirming whether the property uses an onsite wastewater system, obtaining health-department permits, design and as-built records, identifying tank, distribution, pump and drainfield locations, selecting a qualified independent inspector under local rules, reviewing occupancy and maintenance history, observing accessible plumbing and site symptoms, safely opening and inspecting tanks where permitted, evaluating liquid levels, baffles, solids, pumps and alarms, checking drainfield condition and setbacks, documenting limitations and obtaining repair or further evaluation before the inspection deadline.

    Septic records, site and design before repair checklist

    A pre-design checklist for septic repair or replacement covering ownership and parcel limits, permits and enforcement status, existing and proposed bedroom or design flow, prior failures and pumping history, soil and seasonal water conditions, wells and surface water, buildings, utilities, easements, slopes and access, tank and drainfield locations, reserve area, approved site evaluation and treatment method, designer and installer responsibilities, temporary sanitation, abandonment of old components, inspection hold points, restoration, cost allowances and written authorization before excavation or equipment ordering.