Pump, motor, setting depth, drop pipe and cable match the well and design demand
Critical itemSelection should reflect head, yield and electrical supply.
A pre-use private-well pumping-system checklist for confirming pump model, depth, cable and drop-pipe records, safe electrical disconnect and control box, grounding and conduit, check valves and pitless connection, pressure tank type, size and precharge, pressure-switch settings and gauge, relief and drain provisions where required, piping support and freeze protection, treatment and softener connections, leak and cycling tests, flow and current observations by qualified professionals, emergency shutdown, generator compatibility, commissioning sheet and owner instruction before routine occupancy.
6 items to check
Selection should reflect head, yield and electrical supply.
Water-system electrical work should be safe and serviceable.
Incorrect precharge causes short cycling and poor storage.
Controls should match tank and pump limits.
Piping should avoid contamination, freeze and water hammer problems.
Commissioning should create a baseline for service.
Use after pump or pressure-system installation and before normal use. Qualified professionals should perform energized and downhole diagnostics. Do not enter septic tanks, wells, pits or excavations; lean over open tanks; breathe confined-space gases; touch exposed wiring; operate pumps dry; drink unverified water; add chemicals to mask a failing system; or drive heavy equipment over tanks and drainfields. Openings require secure barriers and qualified control. Private-well and septic rules vary substantially by jurisdiction.
A wellhead checklist for confirming the well location and construction record, casing height and integrity, approved sanitary cap or seal, screened vent orientation, protected electrical conduit and pitless-adapter area, positive drainage away from the casing, separation from septic, fuel, animals, fertilizers, floodwater and vehicle hazards, freeze protection without creating contamination paths, secure access, abandoned-well control, disinfection after opening or repair and dimensioned photographs before landscaping, grading or structures reduce inspection access.
A well-performance checklist for defining the purpose of testing, reviewing well log and prior seasonal behavior, measuring static water level with appropriate equipment, selecting a qualified pumping or flow-test method and duration, recording discharge rate and disposal location, monitoring drawdown, pump performance, turbidity and recovery, avoiding damage to a low-yield well or nearby property, interpreting sustainable yield separately from short-term plumbing flow, relating results to household demand and storage options and issuing limitations and drought-season recommendations before purchase or pump redesign.
A buyer checklist for confirming whether the property uses an onsite wastewater system, obtaining health-department permits, design and as-built records, identifying tank, distribution, pump and drainfield locations, selecting a qualified independent inspector under local rules, reviewing occupancy and maintenance history, observing accessible plumbing and site symptoms, safely opening and inspecting tanks where permitted, evaluating liquid levels, baffles, solids, pumps and alarms, checking drainfield condition and setbacks, documenting limitations and obtaining repair or further evaluation before the inspection deadline.
A pre-design checklist for septic repair or replacement covering ownership and parcel limits, permits and enforcement status, existing and proposed bedroom or design flow, prior failures and pumping history, soil and seasonal water conditions, wells and surface water, buildings, utilities, easements, slopes and access, tank and drainfield locations, reserve area, approved site evaluation and treatment method, designer and installer responsibilities, temporary sanitation, abandonment of old components, inspection hold points, restoration, cost allowances and written authorization before excavation or equipment ordering.