Installed locations, materials, quantities and changes reconcile to the signed scope
Critical itemEvery promised assembly should have a final status.
A project closeout checklist for reconciling the signed insulation and air-sealing scope with installed quantities and locations, confirming all safety, moisture, ventilation, electrical and combustion corrections, collecting permits and inspection approvals, product labels and installed certificates, blower-door or other verification results, before-and-after photographs, warranties and maintenance instructions, submitting utility, tax-credit or rebate documents accurately and holding final payment until deficiencies, exclusions and future monitoring responsibilities are written and accepted.
6 items to check
Every promised assembly should have a final status.
Closeout should include hard-to-see edge conditions.
Energy work should not close with unresolved safety risk.
Future verification needs exact product data.
Documentation should be accurate and current.
Performance depends on keeping vents, fans, alarms, roofs and moisture controls functional.
Use before final payment and incentive submission. Incentive eligibility and tax treatment change over time and should be verified with the current program or qualified adviser. Do not enter unsafe attics or crawlspaces, step between framing, disturb suspect vermiculite or other hazardous materials, cover exposed electrical hazards, block combustion air or vents, seal active moisture, or work near hot flues and recessed fixtures without required clearances and qualified review. Air sealing can change building pressures and combustion behavior.
A post-work verification checklist for confirming the building is ready for diagnostic testing, recording blower-door setup and baseline comparison, locating remaining major leakage without damaging assemblies, evaluating pressure relationships and exhaust interactions, completing qualified combustion-safety checks for affected fuel-burning equipment, confirming ventilation and makeup-air provisions, correcting unsafe or out-of-scope results, retesting after corrections and delivering an understandable report rather than treating a single leakage number as proof of comfort, moisture control or indoor-air quality.
A pre-project checklist for reviewing comfort complaints and energy use, documenting enclosure and HVAC conditions, identifying air leakage and missing or damaged insulation, separating roof or plumbing leaks and indoor humidity from heat-loss symptoms, assessing ventilation and combustion equipment, defining safe diagnostic testing, prioritizing high-value measures, checking utility or tax-program documentation and issuing a room-by-room scope before insulation products or contractor bids are selected.
A pre-entry and prework attic checklist for confirming safe access and walking surfaces, identifying roof leaks and wet or deteriorated sheathing, locating suspect vermiculite or other hazardous material, mapping wiring, junction boxes and recessed lights, checking flues, chimneys and heat-producing equipment, tracing bathroom and kitchen exhaust, documenting existing ventilation and baffles, evaluating storage and pest contamination, protecting occupied areas and approving corrections before insulation is moved or air sealing begins.
A pre-insulation checklist for qualified review of chimneys, metal and factory-built flues, combustion-air openings, draft and venting concerns, recessed luminaires, transformers, fans, motors, junction boxes and wiring; constructing approved dams or guards where required, preserving service access, restoring fireblocking and rated penetrations, protecting heat-producing equipment from insulation contact, documenting manufacturer-listed clearances and correcting unsafe conditions before spray foam, loose fill, batts or sealants are installed.