Every chimney and vent type is identified and required clearance is marked
Critical itemClearance depends on the listed assembly and surrounding materials.
A pre-insulation checklist for qualified review of chimneys, metal and factory-built flues, combustion-air openings, draft and venting concerns, recessed luminaires, transformers, fans, motors, junction boxes and wiring; constructing approved dams or guards where required, preserving service access, restoring fireblocking and rated penetrations, protecting heat-producing equipment from insulation contact, documenting manufacturer-listed clearances and correcting unsafe conditions before spray foam, loose fill, batts or sealants are installed.
6 items to check
Clearance depends on the listed assembly and surrounding materials.
Air sealing can depressurize spaces and affect appliances.
Non-IC or unknown fixtures should not be buried.
Insulation should not conceal required access or cooling.
Air sealing should not weaken required fire separation.
No safety issue should remain an informal field note.
Use before air sealing or insulation touches heat-producing or electrical components. Product labels and adopted requirements control exact clearances. Do not enter unsafe attics or crawlspaces, step between framing, disturb suspect vermiculite or other hazardous materials, cover exposed electrical hazards, block combustion air or vents, seal active moisture, or work near hot flues and recessed fixtures without required clearances and qualified review. Air sealing can change building pressures and combustion behavior.
A pre-entry and prework attic checklist for confirming safe access and walking surfaces, identifying roof leaks and wet or deteriorated sheathing, locating suspect vermiculite or other hazardous material, mapping wiring, junction boxes and recessed lights, checking flues, chimneys and heat-producing equipment, tracing bathroom and kitchen exhaust, documenting existing ventilation and baffles, evaluating storage and pest contamination, protecting occupied areas and approving corrections before insulation is moved or air sealing begins.
A pre-insulation air-sealing checklist for defining the pressure boundary, exposing and sealing top plates, plumbing and wiring penetrations, chases, dropped soffits, partition transitions and attic hatches with compatible materials; treating large openings with rigid backing, preserving flue and electrical clearances, coordinating kneewalls and ducts, avoiding moisture trapping, documenting concealed work and verifying completeness before loose fill, batts or spray foam make bypasses difficult to find.
A pre-project checklist for reviewing comfort complaints and energy use, documenting enclosure and HVAC conditions, identifying air leakage and missing or damaged insulation, separating roof or plumbing leaks and indoor humidity from heat-loss symptoms, assessing ventilation and combustion equipment, defining safe diagnostic testing, prioritizing high-value measures, checking utility or tax-program documentation and issuing a room-by-room scope before insulation products or contractor bids are selected.
A pre-cover attic ventilation checklist for confirming the approved vented or unvented roof strategy, documenting soffit and other intake openings, installing durable baffles that maintain the designed air path, protecting insulation from wind washing, keeping roof vents, fans and mechanical exhaust distinct, preserving clearances at roof decks and eaves, sealing the ceiling boundary below, coordinating narrow bays and obstructions and photographing each eave before insulation hides the intake and baffle work.