The crawlspace is clearly designated as vented, sealed/conditioned or another approved assembly
Critical itemInsulation and air boundaries should align with one strategy.
A crawlspace checklist for confirming whether the approved strategy is vented or sealed and conditioned, resolving standing water, drainage, vapor, pest and structural problems first, checking ground membrane and perimeter continuity where applicable, locating insulation at the intended boundary, preventing sagging and wind washing, sealing rim and service penetrations, protecting ducts and pipes, preserving combustion and equipment requirements, documenting humidity or moisture performance and completing access, labels and maintenance guidance before final payment.
6 items to check
Insulation and air boundaries should align with one strategy.
Insulation should not conceal chronic moisture.
Soil moisture control should be durable and serviceable.
Coverage should remain in place under expected conditions.
Changed crawlspace conditions affect freeze and mechanical performance.
Final appearance should be supported by early performance data.
Use only after drainage and crawlspace health problems are addressed. Do not mix vented and sealed strategies without design. Do not enter unsafe attics or crawlspaces, step between framing, disturb suspect vermiculite or other hazardous materials, cover exposed electrical hazards, block combustion air or vents, seal active moisture, or work near hot flues and recessed fixtures without required clearances and qualified review. Air sealing can change building pressures and combustion behavior.
A pre-project checklist for reviewing comfort complaints and energy use, documenting enclosure and HVAC conditions, identifying air leakage and missing or damaged insulation, separating roof or plumbing leaks and indoor humidity from heat-loss symptoms, assessing ventilation and combustion equipment, defining safe diagnostic testing, prioritizing high-value measures, checking utility or tax-program documentation and issuing a room-by-room scope before insulation products or contractor bids are selected.
A post-work verification checklist for confirming the building is ready for diagnostic testing, recording blower-door setup and baseline comparison, locating remaining major leakage without damaging assemblies, evaluating pressure relationships and exhaust interactions, completing qualified combustion-safety checks for affected fuel-burning equipment, confirming ventilation and makeup-air provisions, correcting unsafe or out-of-scope results, retesting after corrections and delivering an understandable report rather than treating a single leakage number as proof of comfort, moisture control or indoor-air quality.
A pre-entry and prework attic checklist for confirming safe access and walking surfaces, identifying roof leaks and wet or deteriorated sheathing, locating suspect vermiculite or other hazardous material, mapping wiring, junction boxes and recessed lights, checking flues, chimneys and heat-producing equipment, tracing bathroom and kitchen exhaust, documenting existing ventilation and baffles, evaluating storage and pest contamination, protecting occupied areas and approving corrections before insulation is moved or air sealing begins.
A pre-insulation checklist for qualified review of chimneys, metal and factory-built flues, combustion-air openings, draft and venting concerns, recessed luminaires, transformers, fans, motors, junction boxes and wiring; constructing approved dams or guards where required, preserving service access, restoring fireblocking and rated penetrations, protecting heat-producing equipment from insulation contact, documenting manufacturer-listed clearances and correcting unsafe conditions before spray foam, loose fill, batts or sealants are installed.